Forever Friday 15/42

Thursday was the day it all came together, literally. Mr Professional came out and we poured concrete into the bridge footings. Nine cubic yards all mixed on site and shoveled into the concrete blocks. I realize this doesn’t sound very impressive but trust me if you were the one shoveling or mixing the concrete you would know that it is a lot of concrete to do at one time.

We did the half closest to the house first. Early on we figured out that we might not have enough concrete mix so we started adding gravel to the mixer to stretch it out, we gained about 30% more concrete which was just enough to finish the entire job. My helper had to go run some errands during the mid day so I took a nap in the pickup after minimart lunch and then slept for another 30 minutes on the hallway floor. The ceramic tile is very cool and if you are overheated it will suck the heat right out of your body. It is a little hard but life is about trade offs and the cool down experience is what I was hoping to accomplish.

We started back up after we moved power, the hose and the mixer to the other side of the spring. We thought about using the tractor again to move the mixer but just ended up manhandling it the 20 feet across the water ditch. I have even decided that I am going to get some sun and set a timer for one hour and went shirtless. My plan is to do that every day I am outside. I don’t want to get burnt but I feel better with more sun. I realize that the long sleeve shirt and scarf and hat are necessary if I want to stay out all day in the sun.

On the uphill side we decided to go with a solid wall as the upper hillside area is putting more pressure on the wall. The bridge is just over five feet wide. My actual bridge that floated off is only four feet wide but since I was the only one who could get the four foot wide tractor over the four foot wide bridge it needs that extra one foot. Once Tex tried to dump the tractor into the spring by missing the bridge it had an extra railroad tie added. That will be even worse now as they will drop down over a concrete wall.

I won’t set the bridge for 3-4 days to let the concrete cure. I will be starting in on the fence next. It will be a joy to try and dig holes in the middle of summer. I see myself starting a bunch of holes and filling them all with water and letting it soak in for a few hours and drilling and water and repeat until I can get deep enough to set a post. I am going to create anchors on each side of the fence by making large rock cribs and then just cow panels down to and over the water. This way during a flood the cow panels can float up wards after the water pushes out the staples. The water will even be able tear out the fence posts next to the spring. This will result in me only losing a single post on each side of the water. This amount of damage is very easy to fix. Redoing the entire fence 30 feet back from the water because the woven wire fence held and it sequentially ripped out every railroad tie attached to that piece of wire, not cool.

I had a very nice surprise as my department staff at work sent me out two bags full for a care package. I have already started eating the candy and jerky and drinking the coffee! It was a very thoughtful gift and I am very appreciative. Even more so that everyone is allowing me the time away from work. That gift is the most needed. Someone offered Annmarie the choice to extend my time off a little longer, she told them that I would be ready on day 43 to return to work!! I am definitely disrupting the routine at home. I love her very much and know very few women who would put up with me. Always marry your betters, the best advice I can ever give to another human being. They will make you a better person.

Forever Friday 13/42

Yes, I am committed to seeing this through and will be doing the Forever Friday theme for another 29 days! On the plus side I am making progress on the farm and it is starting to show. I have high hopes for getting the fence in the orchard fixed in the next ten days. That is one of the four essential tasks that needed to happen during this rest and relaxation period.

Tuesday was my errand day. I went to town and took care of a bunch of stuff. The best part of the day was after I came home and took a two hour nap! It was the first nap during my 12 days off. It felt great and I was still able to go to sleep on time and wake up the next morning just before my alarm.

We have company, dear friends, coming on Friday so this morning was spent cleaning up around the house. Mr Professional came out to help and will be here tomorrow also. We cleaned up all the bags and trash from the lavender area, installed edging along the lavender field, put away all the tools and I killed more thistles. We then moved more trash out of the yard, cleaned off the front porch, and even cut the hole in the top of the bathroom vanity. We moved the vanity to the breeze porch where I will be giving it a heavy coat of butcher block oil/bees wax treatment. As soon as I can get every field replanted this fall we are hitting the upstairs bathroom hard to get it finished. We need two bathrooms!!

Mr Professional and I got the second bridge footing installed today! The first one has all the rebar it needs and the second one has about 50% of the rebar installed. We will start pouring cement first thing in the morning!! I kept telling him that this side was a lot easier to dig. We never had to use the breaker bar or pull out a single big rock or break a rock in half with the breaker bar. It was easy digging. Tomorrow we should be able to get all the concrete poured and the rest of the wall on the barn side finished. We will just wait for a few days before trying to install the bridge. Once the bridge is in place I will put the auger on the tractor and we start drilling fence holes!!

There was a slight delay today when I noticed the bull out eating on the hay pile with the alpaca. He had jumped down into the spring ditch and pushed his way through the fence crossing. We will now have to install some cable across the railroad ties to keep him from lifting the panels. He is way too smart. Unfortunately for him, he likes apples and by the time I figured out what he had done he was walking toward me and the apple tree. I picked a couple of apples, gave him one when he came into the pasture and when he went through the gate gave him another then locked him out of the crossing until we can get it fixed.

Before headed in for the night I went out and checked our packages the UPS driver dropped off. My punch pins had arrived so I went over to the manure spreader and punched out the gear pin! Unfortunately, now I need a gear puller…