Office continues

I finally managed to get back out to the office today. My plans last weekend were thwarted by the flu! I had flu starting on Sunday and was out all week from work. Which meant I actually worked at the paying job on Friday to try and catch up. The heating guy called on Friday and wanted to know if we were ready for the heat pump to be installed. Now I don’t have power yet but we did get the wall finished last week so Annmarie told them yes. The inside unit was able to be installed in a couple of hours. This has prompted me to make the big push to get power up and going in the new box. Today I went out and wired all the rest of the switches and outlets on the finished walls. This only leaves me four outlets on the unfinished wall to complete. I got the workroom light installed and hooked up to the switch. I even managed to tear open one of the track lights for the main area and get it all set up and ready to install. The plan for tomorrow is to get the three lights installed and the three terminal boxes in the attic installed. As soon as I cut the power to the current box I can pull the three wires into the attic, wire them into the boxes and move the power supply to the new box. Viola! New box will be installed and then I can get the last wall covered.

We did get some snow, then a chinook wind and now a lot of mud. It’s supposed to get down to the low teens next week and snow some more. This time of year we bounce all over the place.

Leave a comment