I had a plan on Sunday to get the freezer room almost done. I knew I would not be able to install the insulation in the ceiling as I need it purchase one more roll first. I figured if I could get the last section of the wall covered and then I could use something on the ceiling to hold the insulation up. I wasn’t sure what but I have two full sheets of wood paneling and 1/2 sheet of 3/16” plywood. I think it’s enough to cover the ceiling. After I got the siding up, four separate pieces of varying types and sizes of siding, I figured I could use the scraps of 1×4 boards I had used for trim in the office. I had just enough to cover the ceiling liberally and make it easy to install the paneling. Paneling is not designed to be hung upside down and it will need a lot of wide headed screws to hold it up. This took a lot longer than I had anticipated. Piecing things together may not cost much in materials but it does cause you to use a lot more screws and a lot more time.

I cut off a little piece of the thick bathroom future countertop, after sanding two edges I glued them together. I need to cut a triangle shape and was missing about two inches of the tip of one triangle to complete the top. I will leave it glued and clamped for a few days as I will not be able to work on it until then. I will need to put a new blade on my skill saw before I cut the triangle. I plan on sanding it all down first up to 80 grit, cut the proper shape and then finish sanding it. I was hoping I could crawl underneath the counter and screw up from the bottom to hold it in place, but I don’t believe I will be able to do that. I don’t really want to just use glue. I may have to drill four holes in it, about 1/2’ deep and then attach it directly from the top then fill it with a walnut dowel glued in and sanded down. I am going to have to use a polyurethane coating to seal the top. I need something that can get dusty and will be easy to wipe off when its cleaned. This is still an idea that is incubating, hopefully by the time its sanded down I will have finalize my attachment and finishing plans.

I have two very nice pieces of three foot by 20” chunks of two inch thick black walnut. I am unsure where I am going to use them. Once the freezer room is done and the freezers are moved I will start working on my office area. I have the inner door (old wooden exterior door), it just needs a new opening created that will hold it. My current door opening is not square and about an inch too short and too narrow. I will have to reframe the top and one side to make it fit correctly. I keep fluctuating on what I will setup in the man room. I believe I am going to setup the reloading equipment on one side and then start working on a jewelry bench on the other side. I will need to keep an eye out for a scrap kitchen hood to use as a soldering exhaust hood. Annmarie is so happy with her indoor “grow” super quiet vent fan that I think I will use that as the suction source for the ventilation.
This will get the room closed up but I will still need to buy a new back door and a new window. I need to fix the back porch as one corner is trying to fall apart. I will also need to line the entire inside of the room with boards. Needless to say it may take me a while to get this done!

Annmarie spotted our barn owl! Their used to be a pair of them but in the last few years we have only spotted one. Their was a mated pair on the farm for over 30 years. Maybe the pair is just hiding so well that we only ever spot one at a time?