Getting ready for contractor

Last weekend I had to start getting things ready for the contractor. They were going to come out and start tearing the old vinyl siding off and get ready for the new LP Smartside siding. The trouble is I needed to get some things done. I had to remove everything away from the house so ladders, boards, some TREX decking I had left over were moved away from the house. I had to take down the temporary fence on the North side of the yard. I really just rolled it up most of the way. I had never set the posts yet or added a gate as we knew any contractor would have to get over on this side with equipment.

They wanted to bring in a 60’ cherry picker and that meant getting across or through the front spring. I had created a crossing for the septic pump truck but the driver did not want to chance it and was able to reach the tank from our driveway. I had dug out the large rocks I had used for the crossing. So I tore down the temporary crooked fence I had stopping the horse and sheep from getting out of the main barn lot. I filled the crossing with 2-3” rocks and packed it all down by driving over it with the tractor. Some of the water is flowing through the rocks but mostly it is crossing a wide spot with about 2” of water. I used part of the temporary horse corral panels we had blocking the narrow creek side of the barn lot. This can only be temporary as I need those panels to block off the spring access when we run cows through the barn lot. So I may have to insert a small fence. I am thinking about just making a wire gate. We will almost never use this crossing but it is nice to have the option. I am tired of buying new metal gates at $350/each. I need about another 10 gates and am now going to be selective in which ones get a metal gate. I did find three more metal gates while I was out and about on the farm. It took me a few hours to get all of this up and in place.

I salvaged what honey I could from the hive that died in early winter and was able to collect five half pints. We had them all sold in about ten minutes. We could easily sell 5-10 gallons of honey annually we just cannot produce anywhere near that! We are looking at getting another Nuc and starting a second hive this spring.

Every once in a while I find one of these salamanders when I pick up a plank that has been on the ground for way too long! I am pretty sure we have one living down in the main water shutoff access hole. They are pretty calm. I no longer disturb them and just let them wander off on their own. We are so looking forward to getting the siding completed.

Leave a comment