A lot of little things

Saturday was a full day for us and farm work was not going to happen. Mr Rainman came out and spent the day catching up a lot of little things. I had purchased 20 bags of sand, 15 stepping stones and 12 bags of pea gravel the day before for the projects. He started by working in 18 bags of sand into our future asparagus/strawberry elevated bed out in the lavender area. Our two year asparagus crowns had just arrived on Wednesday and they needed to be planted. He had two bags left over and I used those when I planted the 24 crowns that evening. We don’t get to do anything but hope they survive this year and maybe next year we will get to harvest some asparagus as it will be three years old by then. The Gingerman is bringing us some strawberry starts next month and we will put those right on top. The Lavender only gets watered twice a week so we are going to put the asparagus on the same circuit as them.

Annmarie has been wanting to be able to feed the cats barefoot but now that we have to walk across eight feet of rough gravel she has been requesting stepping stones. He got a channel dug and then the concrete steps set. Once he got the gravel around everything he watered it really well and then reapplied gravel. The extra gravel went outside the fence on the yard side. We are going to make a small gravel area by the gate so the extra gravel went there. It turned out very nice. The only thing left is to extend the cat rain roof so their food gets better protection when it rains. I need to extend the sides down and put a front on so the snow cannot blow in as easily.

The next project is purely a Mr Rainman idea. We had been talking about various ways to fill in the old flower beds in the mud room. He had suggested filling them up with pea gravel. This was a wonderful idea so I picked up 12 bags. The only real problem is even though it was bagged it was still pretty dirty. So he brought the cement mixer over and washed the pea gravel in it. When it was clean he dumped it out on the ground and scooped it up for the mud room. It looks great! I decided it needed a little help drying before we moved the cabinet and shoes back in place. So I started up a small electric heater and cracked open the window. It’s been 24 hours and I think it will take 3-4 days to get the pea gravel all dried out! Once it is then all of the stuff can be put back in place. Mouse is grumpy because his food area is cluttered and he does not like it.

The last thing he did for the day was gets all of the garden beds cleaned out and an old wooden barrel cleaned out and tossed onto the burn pile. It was too far gone and had a large hole in it. We are still holding off on planting the garden due to the freezing temperatures

The contractor came out and installed two of the three windows but they were not double hung. He had ordered double hung but was not given them. New ones are on order. Our new siding should be delivered May 13, 2024. They will start on the sides away from where the windows need replaced.

Our cows started having calves 2 days ago! We now have two calves on the ground and healthy. There are 7-9 to go, I am unclear on how many cows are pregnant.

Leave a comment