Gazebo ready for roof

Well it was time to make some progress on the gazebo. The final step in the assembly process is to get the roof up. Since the crane thing was not an option for me, I needed to use Plan C. I mounted the two ten foot posts on the front of the pallet forks on top of a pallet. I drilled a hole in one and attached a bolt with a hook thinking I could somehow attach it to the fork railing. Instead I ended up running a tie down through the upper slats and cranking it tight. I used a chain around the bottom of the post tied to the fork. I did not want the bottom to give out at all. I then drove over to the Gazebo opening and tried to get the posts through the opening. I could not tilt the platform enough to get the posts inside the Gazebo. So I had to tear down my post setup, toss the posts to the side and drive the tractor into the Gazebo. Once inside I mounted the two posts then proceeded to use the scraps of 2×4 from the house window trim to stabilize the posts and to build a top that is hollow. This is because we will need to put a ladder up through the middle to bolt the center roof pieces in place.

Once I had the platform built I went over to the pile of roof pieces and dug around and tried to figure out how to attach the roof to the outer wall. There is a weird small attachment piece that is bent on three angles. I could not figure out how it went onto the gazebo edge. Gingerman helped me roll the center piece over to the gazebo and then lift it up onto my fancy dancy platform. This would not have been possible to do alone it weighs too much. We took the pickup and trailer over and loaded up the roof pieces. Because I have the tractor with the pallet forks all tied up! I should have moved the roof pieces over with the tractor before building the platform.
I went inside for the day and was talking to Annmarie while she made homemade tomato paste. This is not super easy and not very much is obtained but it tastes great! We were talking and I told her I was unsure how the gazebo roof kept birds out of the tall peaked ridges between each piece. Then it dawned on me, the little weird triangle piece on the roof attachment is the part that goes up into the ridge! Now it will be super easy to get all the roof pieces installed.

Gingerman and I got an impact driver, drill and some large head treated wood anchors. The floor in the barn is coming up in a few places as the old screws have rusted off. It was perfect time to work inside as it rained for a whopping 15 minutes. The rain gauge did not even register the rain. Once we had the floor repaired we set up the sorting chute and unwrapped the old hay so the sheep can tear into it and create bedding. They will spread it out as they tear through it. We will need the chute to tag and band the lambs in a couple of weeks.

Leave a comment