Work room ready

Mr Rainman came out today so we could finish getting the old house room ready for a workspace. We need to build the custom oak cabinet and we will need to get the paint off the bathroom door and refinish it. There is a ton of space now! I opted to keep the one shelf unit full of screws and connectors in the old house. I am always looking for a nail or screw and this will keep them handy. The Gingerman helped me move the old kitchen cabinet into the workroom and it will hold clamps and DeWalt tools that don’t need to be out in the machine shed. I also need to order some more battery holders so I can keep charged batteries on the wall and any battery found laying around can be assumed to be empty.

The room was vacuumed from ceiling to floor then the leaf blower was turned loose on the room to try and get the last vestiges of dust. Nope, it looked like a sandstorm had been cut loose in the room. We will come back in a week and vacuum all surfaces again. That should be good enough to keep the dust from falling down onto the bathroom projects. We would need to go up in the attic and vacuum the entire area above the room. That is really not necessary for what we are doing.

We are closing on being ready for the bathroom remodel. I have managed to stage the following items:

  • All enclosed single piece elevated toilet (heavy!)
  • Bathroom light
  • Exhaust fan with Bluetooth speaker
  • Magnetic shower head on a wand
  • Sink
  • Sink faucet
  • Sink push button drain
  • 10/4 100’ wire for bathroom heater
  • Overhead 220V heater
  • 30 minute 220V timer switch for heater
  • Solid brass knobs for vanity and custom cabinet
  • Solid brass handles for vanity
  • Solid brass toilet paper holder
  • Zip wall zipper
  • Wall towel rack

The biggest thing left is the Schluter system. I think I am going to do a membrane covered floor to disconnect the tile from the subfloor. I talked to the project manager yesterday and I can use tongue and groove wood on the upper half of the two bathroom walls, zero sheetrock needed! This is a huge selling point for me as I hate working with plaster, I make such a mess.

I did not really feel like sorting out in the old chicken coop so there is a huge pile of stuff out there that still needs to be sorted. It can stay there for now and I will sort it eventually. We even left all of the tiling tools in the old house for staging. I will need to dig around in the box before I go buy Schluter parts so I know if I need to pick anything else up.

Mr Rainman will come out one day this week and vacuum the house attic. We will need to take up some of the attic floor so that I can wire in a second bedroom light. It is too dark in there at night with only a single overhead light. It would probably help if we did not have stained glass lights throughout the entire house.