
Well, we managed to get three more days onto the bathroom project. I spent most of Friday cleaning the tile so we were ready to put the grout down. I had to scrape and vacuum the tile clean. I was a lot messy when I started installing the tile. I became much neater as I continued the install. It took me all day to scrape everything clean and vacuum it all up.


On Saturday, Mr Rainman came out and touched up a couple of spots then we decided we were ready to go. He mixed up the first batch of epoxy grout and I tried to get it into the cracks. I had this big plan on using grout bags and squeezing it into the cracks. That took forever and I wasted about 15 minutes before giving up. As each batch of grout only has a 80 minute work time I just could not mess around with the bag method. We ended up getting three batches onto the walls Saturday. For the third batch I had to wear leather gloves then put my thick disposable nitrile gloves over them. I had already managed to get a large blister on both palms and I was hoping the leather would help. It did help but I had already torn open the blister. I spent 80 minutes brushing on grout and Mr Rainman spent about an hour cleaning it all up. We just kept alternating roles until we had three batches installed. I did the last wash on Saturday so he could go home. We managed to cover a lot of the bathroom so we were certain that we could finish on Sunday.

It was a good thing we only had to mix two batches on Sunday as my blisters could not handle a third batch. The leather gloves helped for batch four but I had to use some moleskin on my hand and the leather gloves for batch five. I was right in front of the door when I pulled up three tiles. The mastic was drying up when I installed the tiles near the door and it was obvious that it did not stick down all the tiles. We will have to dig out the mastic and reapply those three tiles. This is going to slow down the cure time on the grout as we won’t be able to repair the floor until Wednesday and then when we regrout we will need to wait another seven days. A minor setback, but one that can be corrected. We can work on the door and getting all of the wall supplies down to the old house. I need the walls installed before I can install the ceiling. The crown molding cannot go up until the walls are completed.




commendable! Famous Street Artist’s Mural Becomes Landmark 2025 brilliant
LikeLike