Bathroom day 29

I have started to change how I am counting days on the bathroom remodel. I am now only counting the days when I work on the bathroom. Otherwise, the days I worked at the paying job would count against me. Now mind you, the project is going so well that I had to set up a portable shower in the mud room on Saturday night and on Sunday morning I had to make some modifications so it would drain correctly. Annmarie will now be able to take a shower whenever she wants which’s is typically at 0430. This is especially important since she is super busy during Lent. I was told that if I had started the project in January I would have gotten an extra month! I was not ready for it in January. At this point, I am not sure I really was ready for it at all.

Mr Rainman and I have been plugging away at it when I can get away from work. I was able to get home early one day last week but I had to go in at 0400 two other days to ensure I got all of my work completed. We have discovered that precutting most of the tile before we mix the All-set is the best way to get tiling done in a timely manner. I had measured and started to cut 76 tiles for the niche narrow walls but when we went to insert the niche it was discovered that I had not accounted for the metal trim and we needed to cut off another 1/4” of tile for them to fit. Mr Rainman cut tiles as fast as he could while I tried to get the shelf installed correctly. We managed to get one niche installed today. There are times the two of us bicker like old ladies. We cannot tell what the other one wants. Usually he cannot tell what I am saying. We get it figured out eventually.

Unfortunately, it is not all tile work. Mr Rainman went up and shut the gates to field 2 and fed the sheep this morning while I fixed the portable shower. He also took bodies to the boneyard. He did say that every rose bush all the way up to the triangle had a small covey of quail in it. They are starting to separate and find breeding partners. We have a lot of pheasants left over from the winter. If spring cooperates with the laying cycles then we will have a lot of game birds this fall. We also have isolated the sheep to the barn lot, ram pasture and area around the old chicken coop. They should start having lambs in the next 2-3 weeks and we want to be able to find them. Once they start birthing we will be locking them up in the barn at night. It makes it a whole lot easier to find and deal with the babies when they are all in the barn. We may need to make jugs next week in the barn so we are ready for the lambs.

Annmarie and I did a thing this week. We bought the other half of the farm from her aunt, Beverly on Thursday. It will take us about ten years to pay it off. We did the math and it will never make enough to pay itself off in our lifetime, it would take 30+ years to pay itself off. We bought it so the farm could eventually be put back together. This is something we have wanted to do for a long time and are fortunate to be able to afford it. Our only real focus on it will be to eradicate some star thistle. Eventually, we will need to repair some fencing.

The baby chickens keep trying to die. I have been having to go out every night and toss the chickens in the door. They keep getting locked out of the coop. I have had to toss in as many as 20 chickens a night. The last few nights the numbers have been steadily decreasing and they are mostly the babies. Tonight when I went out there were none outside! They had all made it inside before the auto chicken door closed. There is hope for them yet. I just need to see how many are hens and how many are roosters now. I should be able to tell in the next 1-2 months. I am going to keep one of the roosters.

Bathroom remodel day 26

Well my vacation is over and the bathroom is not completed. I am sure that I am not the only man in history to utter those words. Wow, this has been a large complicated project. There have been more than a few setbacks but we are still moving forward. I was feeling so good about progress that I bet the wife that by two weeks from today we will be able to use the bathroom. This may have been premature as I figured out two more setbacks today.

Mr Rainman and I have been going at it every day for the last three days. I have been drinking nothing but coffee for days and not very much of that. So much so that last night my legs spent all night cramping up. Today I decided to up my water intake game and drank almost an entire container of V8 juice and spiking the glasses of V8 with liquid IV powder to give it more kick! The V8 hides most of the taste but I would like to sleep tonight so I am sticking with it. The shower walls are still not perfectly square so that has caused us some problems getting the tiles installed. The predone tiles stuck on a 12×12” mesh has caused us some difficulties. The gaps between tiles is sometimes way off and we have to try and move them around. It’s painful as you usually have to cut the mesh.

The All-set we are only mixing in 1/4 bag batches. Mr Rainman has been weighing it out and measuring all of the water. If the batch is too thick we lose working time (bucket time) and then have to waste it after a couple of hours. It has been taking me about three hours to use up a 1/4 of a bag of All-set. I am not the Flash. That is a lot of mixing and cleanup over the last few days.

The goal is to go into work early so I can leave early and get some more bathroom work done. We will see how this process goes.

Today we figured out that our metal tile trim will not work inside the shower. That tile is thinner than the tile we bought the trim for so it is too big. I will need to go over to Hermiston and trade it out for a smaller size. We also had the niches back wall completed when I realized there were no shelves installed. I had to do a search on Google and figure out that I should have cut the tile on the back wall to accommodate the shelf. We were able to tear out the tile, take it outside and wash the All-set off and then scrape the wall of the niches dry. After I get the new metal trim we will by dry fitting the entire niche before we even mix any mud up to ensure everything fits perfectly. To make this easier I got the boss to agree to another design change. We will be using our 2×6” tiles horizontally stacked so we can cut each one individually and make the outer edge of the niche clean and even.

The Gingerman was out over the weekend and he put together our new grain cracker/grinder and managed to mill about 100# of grain in 15-20 minutes. It works very well. So we will work on cracking the whole grain we are getting so it can be stored that way. In the spring, once it warms up we can just put the grain in a five gallon bucket and let it sprout, then toss it to the chickens.

Mr Rainman put up our new salt tasting center for the sheep. We found a place online that sells about 25 different mineral concentrations for goats/sheep. The idea is that the animals will eat what they need and by paying attention to it you will know what they are short on in their diet. He put this up a few days ago and I spotted the sheep in the back barn lot eating their type of salt. In a week or two we will look and see what type they are eating. Annmarie made labels engraved onto metal plates that we attached above the bins. This way we know exactly what is in each bin.