Well it is a mere 40 days I have vested into the bathroom remodel over the last 11 weeks and we are still closing in on it a bit at a time. I had a few grand delusions and figured I could get all of the crown molding up over a holiday weekend. First of all the crown molding is taking forever. I did not order the precut corners as there are 12 in the bathroom. This is causing me to cut each corner about 12 times before I am getting the angle right. I am just making little cuts but I put it up, measure it, then cut it and measure again and repeat it until it works. On top of that the nails do not want to go into the plywood ceiling so I am now pre-drilling holes with smaller diameter bit and driving the nails in with a nail set when they stop moving with the hammer. I love the way the cut glass light shades break up the light, it looks great on the tin ceiling.


I did get the toilet lid installed. It only took me three tries to get all the pieces in the correct order. It has a push button that releases the toilet lid from the anchor bolts. I had plans to install the three shutoff valves for the bathroom but Annmarie was making rolls on Saturday and I did not want to turn off the water then get in a bind the day before a holiday. I opted to do nothing with the plumbing. My track record with plumbing is abysmal, no need to flout my efforts before the gods. We would all pay for that attempt.

I was able to cut down a board and get it glued into the pocket door. My next stop is to pickup a two pine dowels, one 1” & 3/4” so I can fill both holes in the door. I will just drill a hole the entire thickness of the door and drive in the dowel. This will also help my large piece I just glued in stay in place. Once I have everything glued in place the end will be filled in with some stainable wood based putty. Once it is all smooth and ready for stain I will drill the lock and handle holes in the door.

Since this is Easter weekend I did laundry and cleaned up the house. Mostly, this meant putting away tools from the bathroom. They were stacked up in the mud room and before I could use my new birthday present, coffee bean roaster I needed a spot to store it. This meant cleaning out the mud room and installing the bean roaster and cooler on top of the food dehydrator. The coffee roaster only does 4 oz at a time, so I will need to do two batches to fill up my coffee grinder hopper. It took three batches of beans roasted to get something drinkable. Green beans are only $10/pound so I figure I can drink coffee forever now. The fresh roasted is super smooth and has zero bitter taste. The mud room does get a little smoky, so we have to keep the laundry room door shut. I have been opening up the back door but that is not going to work during winter.
I will keep plugging away at the bathroom. The progeny and Gingerman both got to use the shower and loved it. I need to get the door done so I can start working on the custom cabinet. I need the sawhorses and working space that the door is taking up.