Bathroom remodel day 43

It is starting to get there! We are only on week 13! I did not work on the bathroom Friday other than to move the vanity into the bathroom to see how it fit. Annmarie and I needed time to see it in place and time for our brains to percolate on how it was going to fit.

Today was the big bathroom push, I really wanted to go outside and mow tall grass down with the tractor but it rained off and on most of the day. Nothing really strong as evidenced by our 1/100” on the rain gauge. I do really think we got more rain than that. So going outside was not going to be a great thing so I opted to do the responsible thing and stay inside to work on the bathroom.

I did manage to run around the house, picking up, roasting coffee, cleaning up floor and doing laundry before I got started in on the bathroom. I opted to work on the vanity first. The crown molding is incredibly tedious and I just was not looking forward to it. Annmarie and I played with the vanity until we found the level spot but the vanity was not sitting right. I realized that I knew it only had three supports on the four legs. So I opted to move one of them from the front leg and put it on the missing back leg. Nope, it was a weird all in one piece that was hammered into the bottom of the leg. It was hollow and had a metal cap on it. Once I started prying on it I had to break it all apart. There were holes drilled in the bottom of each foot for these steel sliders. I had to get the drill out and drill out the hollow metal tubing from all of the holes, even the hole that was missing the top. This means I need something to go inside the bottom legs. I found an adjustable set of furniture elevators that will work. I had to special order them, they should be here next week. Now my excuse for not working on the crown molding was gone. I cannot put the granite top on the vanity until the feet are repaired as I had to tip the vanity up onto its side to get to them.

I am definitely going to have to do some reworking on the vanity drawers. The pipes are not in the planned spot. The top drawer is fine but the next two down will need to be reworked. I will just remove the drawers and get the countertop, sink and all plumbing installed then I will worry about fixing the drawers so they will fit.

It took me over three hours to do the other half of the crown molding. I am officially done with the crown molding for now. When I go to put the custom cabinet in, I will have to cut the top of the molding in the corner where the cabinet will slide in. This way I can wrap the crown molding around the top of the cabinet incorporating it into the room seamlessly. I only managed to cut my fingers once today with the tin snips. Working metal is best done with gloves but when doing finish work like this I find myself not wearing any gloves. I cut the pad of my fingers with the nippers! They are appropriately sharp enough.

The decorative hook we had ordered to hold open the bathroom door came on Friday so I decided to try and install it. I will have to remove it and put it back on once the final trim is installed. I had the wall hook installed and was tightening the last screw on the door piece when the screw head twisted off! This is a ridiculous problem, I should not have been able to twist off the screw top. Now there is the bottom half of the screw stuck in the door. I could spend an hour and gouge out a huge hole attempting to get that broken part out of the 115 year old door. I am just going to move the piece over 1/8” and drill out a bigger hole so I can easily insert the two screws. This is a stupid problem.