Bathroom remodel day 48

Well it is only day 48 of the main bathroom remodel, but it is week 36! Annmarie tells me I have to have it done before the wedding. It is gonna be close. I need to get the Sheetrock installed and start the mudding process. I am not very good at it and it takes me some time to get it right. Yesterday I really wanted to get the sand spread out in the Gazebo and then compacted down so we could lay bricks. Rainman and I could not get the compactor started and it had a pretty serious fuel leak. I need to get a new float gasket and try again. We ended up moving furniture for the Mother-in-law and then went and got a new sewing cabinet for the wife from MiltonFreewater. It was cheap at $80 but they said it was heavy. They were not kidding, the thing is solid wood and very heavy. We will get rid of the cheap one now.

I started working on cutting shelves for the bathroom cabinet. Unbeknownst to me, I was failing to account for 3/4” from the back piece in my measurements. We had to recut every one of them today so they would fit. At least they were not too short! I used the Kreg tool to install peg holes for two adjustable shelves and another Kreg jig to put in screw holes to attach the boards together. I was going to leave the holes but I found some wooden plugs you can glue in place to make it all neat so I will be doing that. The plugs are ordered. Mr Rainman helped me get it all assembled then we tried to dry fit it into the bathroom. I had to rip out the corner crown molding as the cabinet is about one inch from the ceiling. It is very tall and a ladder will be needed for the top shelf. We were barely able to stand the cabinet upright once we got it into the bathroom. If we had made it 1/2” taller it would not have stood upright. As it was we had to get it square to the wall and ceiling and turn it on the long side to minimize the arch height. Once it was in place we took a level and worked on getting it moved around and level. It will need to have some trim added at the bottom to keep it level. Mr Rainman reminded me we could just screw the cabinet into the wall above the tile once we had it level. This way I could then work on getting the custom trim job in place to cover all of the weirdness. This is a great plan!

I was supposed to get some wider oak today when I went to Home Depot and I forgot it. I did get some stuff to put on the finish and picked up a single chunk of gutter to put over the office/old house porch steps. They had ice build up on them last winter and I don’t want that this year. That will also require another trip to the hardware store as I grabbed a gutter end from the right end box and one from left end box. When I got home and tried to set up all of the gutter I realized that I had two left end pieces.

I was going to stand up the cabinet in the old house and seal all of the surfaces but the ceiling in the old house is too low to stand the cabinet upright. So I will be doing all of the visible sides then turning it over and doing the back. I want to seal all of the surfaces as it will be in the bathroom.

I did drive by and check on the sheep. They look good and are doing well, no issues.

Leave a comment