Bathroom remodel day 50

The deadline for the bathroom to be completed is our daughter’s wedding in January 2026. This seems to have become a mantra whispered, sung, stated regularly to ensure I do not forget. It is going to be close! After our grandson’s baptism today, Gingerman helped me get the cabinet into the bathroom.

The first thing I had to do was kill the power and get the outlet attached to the back of the cabinet. Luckily, my measurements were good and the hole lined up with the box on the wall. I was able to get it fit properly in my electric nook. I have another small extension that needs to be plugged in so I have enough plugs for all the various bathroom electric items. I just cannot remember at this point what safe spot I chose nine months ago. I am still in contemplation mode, I have not started tearing apart the mud room or old house yet. I think it’s in the back room of the old house but I am just not sure. We have been moving things around so there is no telling where it is actually located.

I was able to get four countersinked screws in the upper portion while leveling the cabinet. The trim near the wall is going to be painful to get lined up correctly. The wall is slanted and the wooden and tile portion are different thicknesses, I am going to have shape the trim piece to fit into the gap. Annmarie ordered metal hooks Sunday so we can hang hand towels next to the sink. I also think this will cut down on water splashes against the cabinet. I am going to carry the ceiling trim around the top of the cabinet to help incorporate it into the room. I had to bend the trim during removal so I will have to hope I have two more intact pieces out in the cellar. I know there is at least one leftover but I think there may be two. I will need to check that this week so I can order some if needed. I will also need to buy four feet of 4-5 inch oak for the foot and top of the cabinet.

When we turned that cabinet on its side to get it into the bathroom, there is about a 1/4” clearance from the ceiling. If I had made the cabinet any taller we would not have been able to stand it up in the bathroom. I would have had to try and shorten the bottom equally. I am not sure that would have gone smoothly as I would not have torn the cabinet apart again to do that.

I had some more straight run chickens grow up. I had to kill two extra roosters as I only want two. When I went into the coop for eggs tonight I saw one more extra roosters that will need to go. The chickens adjusted to daylight savings time well. They were all in the coop when I went out to get eggs.

Our first 30 bales of small round bales has been eaten by each group of cows. They each got another 15 bales today. The grass is green and the cows were not really interested in the hay. Not a single cow even budged or gave me a sideways glance when I was putting the hay out into the feeders.

I got the second coat of oil onto the $25 sewing cabinet we bought. It turned out really nice, a little Formbsy’s, tung oil and a lot of elbow grease made it a gem.

Leave a comment