Bathroom almost complete 99%

It was getting cold outside but its not now. We are getting up to 50F during the day lately with rain. The entire farm is covered in green grass, even the dirt barn lot is green! We have not started feeding the cows or sheep yet. Every few days I go out and feed the rams and bull in Alcatraz. They are keeping the grass pretty low in that area but it is present and still growing. I was going to burn the weeds in Alcatraz but it rained again, poured actually. I would tell you how much came down but our electronic rain gauge was not working the entire day it rained. I just looked over at the weather station and the rain gauge is back! It says we got 3/4” of rain in the last two days, this is totally believable. I managed to go outside yesterday and dig dirt for a couple of hours. I am still trying to fill in behind the concrete bridge footings. The far footing had about two feet and now has about 18 inches left. It is not exactly fast going as you have to throw the dirt about eight feet and uphill over the footing. I did also manage to pile up more large rocks on the other side of the stream bed. There is no water, its dry this time of year. I will need some more big rocks from the upper hillside to finish the footing rock walls. Two hours of digging is fine, I don’t think I could dig all day any more. Just too much, it’s my concession to aging to only dig 2-3 hours at a time and move a few big rocks.

After the digging I went into the old house and worked on sanding the countertop for the upstairs bathroom. The thing is a solid two inch piece of black walnut that was air dried. This means the board had warped about a half an inch and I had to sand out the bow in the board. I have seen the DeWalt battery powered hand planers and keep wondering if they would make leveling these pieces easier? I keep thinking I want to try it but it’s a $200-300 trial and I don’t want to be wrong. So instead I just kept sanding it and using a two foot metal square to see where the high and low spots were so I could sand them out. I spent three more hours working out most of the high spots. The only thing left was to actually cut the piece to fit. Annmarie and I had a discussion on how best to get an accurate representation of the space. There was some disagreement and I ended up doing it the hard way with a few pieces of newspaper and a lot of clear tape. I then used this as a pattern and made several cuts with my skilsaw. I only had to make two more cuts and one sanding intervention before I managed to get it to fit. Three attempts is not bad considering the space is not a bunch of straight lines. There were a couple of rounded spots that had to be taken into account. Once I had it dry fit I went over the entire top again starting with 40 grit sand paper and ending with 220 grit. I finished the top and front with Tried and True finish. I really like the natural compounds and that is what we used on the walls in the bathroom. It fits great and now I just need to glue it down to the plywood underneath, that is next week’s project. Once that is done I will be 100% complete with my part on the upstairs bathroom!

I was in the craft room last night when I noticed the dreaded ceiling paint sags! The only thing that creates these are water accumulations from a leak. This sucks as I just fixed the ceiling a few years ago from a failed condensate pump in the second story closest. So we went up and started emptying the closet. It means cleaning off all of the shelves and then removing them. I was cutting the zip ties off to get the power cord loose so I could remove the condensate pump and accidentally sliced the discharge rubber hose in half. My pocket knife just got sharpened recently and it is sharp! I eventually got the condensate pump out and it was empty. This is bad as the water was on the closet floor. We opened up the heat pump and found some water inside. We just turned the heat pump off and I contacted the heating guy in the morning. I sent him a text and later today he messaged me from the top of some mountain. He was up with his father hunting elk and would contact me when he gets off the mountain. Once the repair is complete we will discuss how to fix this issue.

Winter is coming

Well Winter is definitely coming, we had our first freeze this fall. It dropped down into the low 20’s F and there is snow visible on the mountains and low foothills. We got rain instead of snow but Winter is coming. This spurred the decision to finally go and pickup the big bales of alfalfa that I had purchased this spring. My supplier holds them for me as I almost always pick them up late! I am a reliable customer so it works for both of us. I had been selling off the old small round bales from the machine shed and I managed to get the last of them unloaded and sold the day I went and picked up the large bales. I could store most of the years alfalfa in the machine shed if I had a tractor that could lift 1400# bales 14 feet into the air. But since I do not, I put 15 bales in the machine shed and they are the very last bales that I feed in the late winter/early spring. The rest go out onto the hillside in field 4b. The animals all get locked out of that field and I usually buy a big tarp and toss a lot of pallets on it to hold it in place. After buying the vinyl sign to use as a tarp and seeing how thick it is I bought two 12’x40’ signs/tarps and will lay those across the top of the large bales. I think they may even survive the winter. They should be here by the end of the week. Mr Rainman/me bent the loader support on the Kubota. It is for removing the loader and helping it be freestanding. The pull pin got displaced and the arm popped down while a big bale was getting jostled in place and it bent. The main pin had to be cut in three places to get it to let go! A 2# hammer and punch could not drive it out. The pin has spring clips so it will have to be a special order item. We were able to keep moving hay and that was the important part.

One of the things observed when we got the machine shed cleaned out was that there is a pretty damp back corner of the hay storage side. I had put down pallets last time and that worked really well to keep the hay from rotting. Years ago I had dug a trench on the backside of the machine shed and filled it with gravel to increase the drainage removal from the roof runoff. This did help quite a bit but it looks like it needs more help. Next year the gravel needs to be dug out and some French drain hose installed and then replace the gravel. I will also run the end of the drain farther away from the building. This should help quite a bit. The front ditch works wonders but I made a big sink hole for all of the water to go into and I did not do that with the back section.

Sunday we went out first thing to sort the cows. It was cold again so I put on a long sleeve shirt, knit hat, knit neck warmer, insulated carharts, large bulky quilted long sleeve over shirt and insulated gloves. I had a heavy vest ready to go but decided that I was dressing for -20F instead of 22F. I put the puppy, Chance, on a lead rope and we opened up gates to get the cows to the corral so that the bull could be sorted off. Once the bull is in Alcatraz we can put all of the cows into one herd. We can run one herd of cows until January when this years calves need to be weaned off. We will sort off the market cows and the calves and put those 11 cows down by the houses and keep the other above the house, there will be three fences and 100 yards minimum between the two herds. In reality there are a bunch of buildings and earthworks that prevent a line of sight from happening. They can still talk to each other and will especially right after we separate them. It is about 3-5 days of lots of hollering and voiced displeasure from both parties.

Chance did great once she got settled down. She wanted to sniff the hillside and find coyotes. She does not like other dogs as they are interlopers on her property. She does fine with our other border collie but not any other dog. We have not discouraged this as our coyote problem is immense and we want her to alert us if she spots one. Mr Rainman and I merely walked to the schoolhouse, had to run halfway up the hill once and then casually walk the cows to the hen house pasture. Once there we were able to separate the bull from the rest of the herd, opened the back door to Alcatraz and he went in as directed. We did not even have to use the corral to sort! I took Chance into the front barn lot and we worked the cows in an enclosed space. I let her run around with the lead rope trailing (there is nothing for the rope to catch on) and giving her commands to move the cows. She did great! I can now get her to lay down while she is mid chase on one of the cows. She will stop and drop to the ground. We need more work on her directions, left, right and circle around. The true key though is to be able to turn off the dog no matter what the circumstances, once you can do that training the other commands is easy. Once we let the cows out there were about 18 sheep that had come in still in the area, so I had Mr Rainman call Chance and work the sheep. We want her to respond to multiple people. A one person dog is great when you are the only one working the dog but having one that will listen to other people is handy. She is a true people pleaser so this fits right in with her personality.

I had shed the gloves, hat and neck warmer by the time we got off the hillside and by the time we got to the hen house I had taken off the outer jacket and was just wearing my Carharts and a light long sleeve shirt! I should have known, the rule is to leave the house with enough clothes that you are just a little uncomfortable and want more to stay warm. Work and exercise will give you the needed heat to stay warm and you won’t sweat.

We put in another gate into the alleyway from the hen house pasture. This way the animals can always get to water. The main spring on the farm originates in that pasture. We have had the gate leaning up against the fence since last year when we finished the alleyway. Now the cows will always be able to get to water. I even chained the gate open so it cannot accidentally get closed. There is one more gate still to be installed there and one small section of fence to install so that the cows can get to most of field four but not the area where we store the cow hay.

Some things continue to amaze me. We had a volunteer pumpkin grow at the main burn pile. The alpaca did not eat the plant, flower or pumpkin but the most amazing part was the plant got zero water. This summer we went over two months with no rain at one point. Annmarie made pumpkin purée and froze it today. We will be eating the rest for dinner tonight. I am going to plant several seeds around the pile in the spring! Who knows maybe this is the trick to growing pumpkins. The quail are everywhere, we have very large coveys all over the farm and we have started to keep a quail feed block out front by the old farm equipment pile. We hear quail all of the time now whenever we are outside. Heck, we even have a new pair of barn owls on the place. They have decided to roost in the large trees out front just before sunrise. They talk back and forth and are quite noisy. The coyote hunters have tried two more times without any success. They did see more coyotes but could not safely shoot them. Pretty quick we will be locking the sheep up at night and only letting them go out into the ram pasture as they will have lambs.

Field #1 ready for animals, still not completed

Monday was spent fencing some more in field #1. A new fence around seven acres is no small feat. Not to mention the new section is curved like a C so it makes it painful to stretch. I really wanted to get the fence up so we could let the animals in to eat grass. The road side and wheat field side have an old fence that needs repaired. Unfortunately, sometimes the repair is more painful than just stringing up new wire.

The Apprentice and I got the last 500’ of fence up and even got it all clipped onto the T posts with a single strand of smooth wire on top. I used a four foot piece of pipe as a cheater bar to really crank down on the fence tighteners until the fence started to sing when I ratcheted up the tightener a notch. I opted to not install the wooden stays yet. I wanted to get all of the fence up and without the stays the fence will hold the livestock. Mr Rainman and the Apprentice can get all of the wooden stays on three sides of the field installed on Wednesday while I am at the paying job.

So we went to the far end and worked on the ditch crossing and did battle with the downed black walnut tree. It landed right where we needed to install a railroad tie and put the ditch crossing in place. We managed to get it installed and the paneling cut and in place. The last thing was to install the gate and we had it done enough. Which was a good thing as both of us needed a day off and no fencing. The Apprentice has collected an astounding amount of bruises and scratches in the last two weeks.

Annmarie is inspecting our hives and deciding whether we are going to get any honey this year. The bees split and they have not managed to make as much honey as last year so far. So I don’t know if we are going to get to harvest any.

The quail are everywhere! It is amazing to see how many we have this year. They are really calm and just run around everywhere.

We did have one of the brown alpaca just keel over dead Sunday night. The nephews found it on Monday. It was one of the old ones and was mighty skinny. I had been giving it the side eye every time I saw it when I was headed down the driveway. We now have 10 alpaca. It’s plenty and at least five of them will just come right over to the cars for a treat. If you open the trunk on the wife’s car they will just push up to the hatch opening and expect something. They are so insistent at that point that they will even let you touch on them until they get said treat.

Freezer room closing in

I had a plan on Sunday to get the freezer room almost done. I knew I would not be able to install the insulation in the ceiling as I need it purchase one more roll first. I figured if I could get the last section of the wall covered and then I could use something on the ceiling to hold the insulation up. I wasn’t sure what but I have two full sheets of wood paneling and 1/2 sheet of 3/16” plywood. I think it’s enough to cover the ceiling. After I got the siding up, four separate pieces of varying types and sizes of siding, I figured I could use the scraps of 1×4 boards I had used for trim in the office. I had just enough to cover the ceiling liberally and make it easy to install the paneling. Paneling is not designed to be hung upside down and it will need a lot of wide headed screws to hold it up. This took a lot longer than I had anticipated. Piecing things together may not cost much in materials but it does cause you to use a lot more screws and a lot more time.

I cut off a little piece of the thick bathroom future countertop, after sanding two edges I glued them together. I need to cut a triangle shape and was missing about two inches of the tip of one triangle to complete the top. I will leave it glued and clamped for a few days as I will not be able to work on it until then. I will need to put a new blade on my skill saw before I cut the triangle. I plan on sanding it all down first up to 80 grit, cut the proper shape and then finish sanding it. I was hoping I could crawl underneath the counter and screw up from the bottom to hold it in place, but I don’t believe I will be able to do that. I don’t really want to just use glue. I may have to drill four holes in it, about 1/2’ deep and then attach it directly from the top then fill it with a walnut dowel glued in and sanded down. I am going to have to use a polyurethane coating to seal the top. I need something that can get dusty and will be easy to wipe off when its cleaned. This is still an idea that is incubating, hopefully by the time its sanded down I will have finalize my attachment and finishing plans.

I have two very nice pieces of three foot by 20” chunks of two inch thick black walnut. I am unsure where I am going to use them. Once the freezer room is done and the freezers are moved I will start working on my office area. I have the inner door (old wooden exterior door), it just needs a new opening created that will hold it. My current door opening is not square and about an inch too short and too narrow. I will have to reframe the top and one side to make it fit correctly. I keep fluctuating on what I will setup in the man room. I believe I am going to setup the reloading equipment on one side and then start working on a jewelry bench on the other side. I will need to keep an eye out for a scrap kitchen hood to use as a soldering exhaust hood. Annmarie is so happy with her indoor “grow” super quiet vent fan that I think I will use that as the suction source for the ventilation.

This will get the room closed up but I will still need to buy a new back door and a new window. I need to fix the back porch as one corner is trying to fall apart. I will also need to line the entire inside of the room with boards. Needless to say it may take me a while to get this done!

Annmarie spotted our barn owl! Their used to be a pair of them but in the last few years we have only spotted one. Their was a mated pair on the farm for over 30 years. Maybe the pair is just hiding so well that we only ever spot one at a time?

Wood bridge part completed

I wanted to get the wooden part of the woodshed bridge put up today. I had the wood in the back of the pickup. I went to get it out and had the 2×8 boards sticking out either side of the pickup with the 2×10 over the cab. I damn near knocked myself out again by hitting my head on a 2×8, I jerked back after smacking my forehead and smashed the back of my head into the other side 2×8 boards. I ended up with an abrasion and small goose egg on my forehead. The only real problem I have with not having hair is that there is no longer a cushion to protect my head from trauma.

I laid out the five 16’ boards and then screwed 10” pieces of 2×8 between them. I used 2×8 boards because I am cheap. I saved about $40by using the 2×8 boards and strength wise I just needed them to keep the boards from warping. I altered the height at which I screwed them in and alternated each board so I could get to both sides with the impact driver and tighten down the screws easily.

I used old 2×10 boards that used to be a concrete form for the decking. They were free so they make excellent decking! I only had one ten foot piece left by the time I was done. The bridge decking is five feet wide and the support underneath is four feet wide. I hung approximately six inches of the decking over the support frame. The decking will be easy to replace if needed and free was a wonderful price.

So far the supplies have cost $360 each for a pallet of Quickcrete. $300 for pressure treated lumber and a box of three inch decking screws. So at this point in supplies we have just over $1000 in the bridge. I may be able to salvage some of the concrete forms to use in the wood shed to line the walls. I need to look at it first before I attempt to reuse them for the fourth time.

There is a little kitten in the wood shed that keeps meowing all of the time. Annmarie is working on taming it down. She wants to have a permanent resident in the barn shed. I am hoping it keeps the raccoons out of the buildings. I have two huge piles of raccoon poop again in the upper parts of the barn. They like to poop up high and they make huge piles over time, so annoying.

I did move some rocks around and attempt to get the rock wall on the wood shed side to meet the bridge. The next big part of the bridge build is to fill up the backside with dirt. Get that all compacted down then I can put in a little gravel and install the large concrete pavers. I am currently leaving that for now to work on the freezer room and the wooden piece for the upstairs bathroom.