Mud room guy finished 90%

Well, Mr Rainman and I managed to knock out most of the mud room in the last two weekends. We are at the stage that I dread the most, the last ten percent. It will take an entire weekend just to get that last 10% finished. It cost about $45/sqft in materials to get the three walls, insulation, exterior door, one small window, and three types of interior lining basically just over $4k for a mud room that I installed with help. I cannot imagine building a house in this day and age from the ground up. My suggestion would be to find a house with good bones and do the work yourself.

I decided to go with smooth plywood on the short sides of the room and we just used some scrap tongue and groove to finish off the top. The back wall has all blue pine tongue and groove. I really do like the stuff but at $10/ea for a 1×6”x8’ board it doesn’t take long to add up when covering a wall. I went through about 80% of the wood pile to find 29 pieces that were worth the ten bucks. Unfortunately, the store won’t bring out more material until someone buys all the crud. I had to go to another store and ended up with white pine in two different patterns. Of course we did not realize that the pattern had changed until we were 60% done and there was only 90 minutes left of work. I just told Mr Rainman that we would be the only ones that noticed it because we had uses different patterns on all the walls so no one would be able to tell that we did not deliberately do it that way.

He talked me into doing a white wash treatment on the wood to protect it, transmit the light and let the wood grain show through. I have never done this before so I am interested to see how it turns out. I also have 60 sqft of cedar closet lining. So once I get the walls all whitewashed I am going to install cedar lining on the two plywood walls. This should help us cut down on bugs and moths. The room is on hold this week as I will need to get outside and work on pruning our fruit trees. The weather is screwy and it keeps changing, 20F-60F in Jan-Feb, it’s not normal. So I need to get fruit trees because it might be 70F in March.

We found a contractor to tear off our vinyl siding, replace three windows and install Diamond Kote siding. The siding should outlive us and the weather should not affect it as much as our vinyl siding. The siding does not have to be painted. It’s a crazy amount of money to do that, more than we paid for our first ever house 30 years ago, just for siding. The job is just too big for me to do in a summer while I am holding down a full time job and trying to work on the farm. It is not possible to do all things, some things have to be farmed out.

We are going to have to get another 16’ of ice breaker stops installed on the front roof of the house. We had a fairly large chunk of ice fall and smash into our new porch railing. It shattered one side of the TREX railing. So that is on the list to replace this summer. It’s always something, the gutters have made a huge impact across the front of the house. The ice breakers worked amazing on the side of the house this winter. Even the black plastic moisture barrier we installed under the house is making a huge difference. We have used about 50% less propane to heat the house this winter. At this rate paying for insulation to install under the floors, our investment might be realized in just one winter. If we continue to use this little propane then I want to add insulating under the house to the summer projects list along with installing the gazebo and getting the man cave closed in. Just a few things to knock out this summer along with hay and weeds and mowing.

I have to say that anyone can really learn to do most things by watching YouTube! I had a couple of install questions on the door and window with the house wrap and I was able to find the answers fairly easily. Watch one, do one, teach one!

We are going to leave the concrete floor for a while. I would like to tile it eventually but it is a mud room and we need it for that reason so the concrete is appropriate.

Mud room progressing

Mr Rainman stopped at the lumber store on his way out this morning so we would have enough lumber to finish up the walls. We had to frame in the door opening to the rough dimensions on the door receipt. I kept the receipt as it did have the needed dimensions and so that I could argue with Home Depot in six weeks when my door is not in yet.

We had to finish the door opening and the frame above the door. The door is 34” so that caused some problems framing the door, we got it worked out. The hard part was the corners. Each corner is an old iron pipe with 6” square 1/4” thick ends and then bolted to the concrete and the porch. The real problem is the pipe is welded in different spots on each end and neither pipe is identical. We had to try and frame around the pipes to get the corners stiffened. This was not easy and we kind of had to piece things together where the wood would actually fit.

When we went out to the barn this morning I tagged and banded the last pair in a jug. It was a little boy and he had pasty butt! The new momma was not keeping him cleaned up and it had frozen to his hair. It was a mess, I got it cleaned enough for him to poop. But it needs to get above freezing so I can get it out of his hair. We may have to bring him inside and get it all cleaned up. I will keep an eye on him. I had to do the same thing again this evening.

It did rain off and on throughout the day and we are under an ice advisory. You can see how the snow is turning into one big ice sheet with water on top. I finally had to start locking the dogs into the laundry room. The puppy’s injured foot was getting scraped up on the ice edges when her foot broke though the ice covered snow and she was leaving blood on the ice. She did not like not being outside while I was outside. It’s supposed to warm up so flooding may be a thing before the week is out.

Mr Rainman and I then worked on getting the plywood sheeting up onto the frame. As things started to get closed in I was able to really see how big the room was going to be and start thinking about what needed to happen on the inside. I think another $1k by the time I buy insulation, sealant and 12 more sheets of plywood with one smooth side. That doesn’t include sealing the plywood or building the countertop, bench stool and two open fronted shelving units. I think we will be into it about $4500 by the time we are all done with it.

It’s kinda warm

Well it has been a long week. Since the tractor cannot be started I have been feeding the cows by hand. After pitchforking 400# of hay into the back of the pickup and then out again for the cows and after working ten hours and getting up at 0345 to go out first thing in the morning to take care of the sheep and lambs; I gave up.

I had a space heater going under the tractor with a canvas tarp over it. I put hotshot in the fuel tank and in the fuel filter and still cannot get the tractor to stay running. I have been trying every day, sometimes twice a day with no success. I went out one dark cold evening late this week in an ice storm and opened the gate to the hay pile. I went out threw pallets out of the way and cut away the tarp covering the front of the pile. It was weighed down with so much snow I could not pull it away. I cut the strings on two large bales and just let the cows have free range on the hay. I do realize this is not the ideal answer but it is my answer. It means the cows get to eat in this bitter cold and deep snow without me killing myself to feed them. I also have time to do other things.

We have a lot of cold, ice, snow and general hard to get around or get anything delivered weather going on now. I got my car stuck in the snow near my mother’s house in Pilot Rock. One of our nephews came and pulled me up a slight incline that allowed me to basically run my car into the deep snow in her driveway until it got stuck. My mother was worried because I did not lock the car up. I told her there was no way they could steal the car, it was stuck in the snow and until I get new tires it was not going anywhere. Annmarie had told me to invest in some new tires a few months ago, I failed to listen and will now be driving the pickup. Except the pickup defroster is kinda wimpy so if its an ice storm I am just stuck at home. I have a brand new snow plow for the tractor that should be in use but since the tractor is down it is still just sitting there! I will definitely remember to treat the diesel in the fall so this never happens again.

The puppy is trying to wear me down. She punctured a hole in her ankle above her paw. We tried to get it healed on our own then had to take her to the vet. The course of antibiotics has helped drastically. The vet told us the cone of shame was needed at all times. Well when it is 2 F outside the puppy uses the cone to beat and thrash on any hard object within reach. I have resorted to duct taping the cone back together. So far I have almost a half a roll of duct tape used to keep it together. She has managed to split it in half twice already. I have 1.5 rolls of duct tape left, I will win.

The chickens don’t really like the cold. But more importantly the starlings really don’t like the snow. We have about 50 starlings in the chicken coop now. It’s a mess, they are eating and pooping everywhere. Now I have holes in the screens and one wall paneling is coming down and I believe there is one hole to the outside eave that is also letting them in and out. We have had subzero temperature for over a week so every night I have to shoulder open the door then chip the pile of frozen bird poop away from behind the door. If I do not do this every day I cannot get into the coop. It took me over 10 minutes one evening and I almost broke the door down. I am focusing on the mud room and the starlings are getting a pass for one more week.

Mr Rainman came out today and we worked on getting the mud room walls up and the pressure treated boards down. Unfortunately, none of the walls are square so each individual upright had to be cut a different length. Over a distance of seven feet the height changed by over an inch on both sides! We are building around the two steel upright pipes that hold the roof up. Those are not even welded straight, so it has caused some interesting adjustments to be made. I have no clue when the door will be in, they are supposed to contact me and said it could take 4-6 weeks and since no shipping company has hardly moved anything in the last week we can just add some more time to the arrival date. The hope is we can get the mud room sheeted and the window installed tomorrow. We will see if the weather cooperates. It was not horrible working in 20 F weather, not great but still doable.

Winter came late but it did come

Well it is officially winter and to top off the snow we have had subzero (F) weather. That does mean that to go to the barn now requires insulated coveralls, boots, knit cap, neck warmer, heavy coat and insulated gloves before going outside. This is doable as we keep all of that out in the laundry room for just this occasion but I forget how brisk the weather can be until my runny nose/breathe causes ice to form in my mustache and beard. It adds a whole new dimension to getting “thawed out” once you are inside the warm house. I had great plans for working on the mud room walls despite the cold. No way, once the cold hit I realized that I did not want to be outside working on a stem wall.

There is always one thing I forget (well maybe more) but it does come back to bite me. I did not add diesel fuel oil treatment to the diesel storage tank this fall. I have not needed it even when the temperature got down to 10F. The tractors have always started. The tractors will not start at below 0F. I had to go to town on Saturday and buy treatment for the storage tank and special “hot shot” treatment for a diesel that is already gelled up. You remove the fuel filter and fill hallway with this stuff and pour a bunch in the fuel tank. I then tented the Kubota in a canvas tarp and put a oil heater under the tractor to try and heat up the entire engine. I also had to purchase a Lithium external jumpstart battery as the cold has really stressed the tractor battery. Not enough cranking power for any extended starting effort. I left all of that overnight and today tried to start the tractor. I got it turned over and going no problem. I had it on low idle as every time I tried to give it a lot of power the engine started to sputter out. My plan was to just let it run and heat up on low idle. Nope, that did not work. The tractor kept shutting down until finally I could not start it again.

So instead I backed the pickup up to a large alfalfa bale in the machine shed that had popped open and hand forked about 1/4 into the back of the pickup. I had dropped off two large bales just before the storm came. I was planning ahead. I should have planned better and put out three large bales! I may have to feed the cows every day by hand until the weather warms up enough to let me fire up the tractor. Not exactly ideal but another lesson learned. Now hopefully I can remember it. I think I will just keep treating all of the fuel that goes through the large storage tank so this is not an issue. I only used about 300 gallons last year. This is just too painful to want to repeat on a regular basis.

My external chicken yard auto door is frozen shut. Luckily, the chickens hate the snow and only come out far enough to eat the snow. They will not get down and run around in the snow. So its not a big deal currently, we will see what happens when the weather warms up. I sure hope the door works after that as it is brand new.

The back porch cats have been moved but we put their food on a ledge next to the root cellar entrance and built a roof to keep the rain off the food. The food is not getting wet but it is getting covered in snow. I am going to have to make a food box enclosed on all sides but the front so the food dish can stay dry. This will have to be added to the project list.

Last minute project before the new siding

We have finally been able to get some contractors to return our phone calls. It has been incredibly hard to find someone who has the time to side our house. We have gone around a few times on what we want and have finally settled on a LP plank siding that has a baked on paint coating called Diamond Kote, it has a 30 year guarantee. I will most likely be dead and Annmarie won’t care that the house may need a coat of paint by then so we are happy with our choice. We need the old vinyl siding removed then the new siding installed along with three windows that have to be replaced from the storm damage that tore up the siding. Here is hoping that we have that process rolling by the end of the month.

Since we had started talking about the siding Annmarie came up with an amazing idea to just create a mud room. Our back door porch has a roof, there is one outside outlet already in the space and a porch light. We just need to add three walls, one with a door and one with a small window in it and then we would be done. When the house gets sided they could just enclose in the mud room and no one would know we had just thought it up. The room just needs to hold coats, boots, our food dehydrator and our barn clothes. This way we could keep all of the mud out of the house. The room does not need any heat as there is no plumbing out there at all. As an added bonus it would enclose our outside power panel so it would now be better protected.

Mr Rainman has come over a few days this year and we went to town clearing off the porch and then ripping down the siding. I had forgotten the house was yellow. When we moved here the house was covered with white shingles before they put the vinyl siding up. Mr Rainman got the pressure treated sill boards cut we just need to modify them to fit around the steel corner posts. Our plan was to hammer out the sill and at least two walls this weekend but it is supposed to be below zero F this weekend and that might not be possible when my face is trying to freeze off. I had to special order an outside door that has a left hand hinge and opens outward. Not a lot of outside doors open outward. It is amazing how expensive building materials are now. Material to build three 2×6 walls with plywood outer sheeting, house wrap, one window and one door costs $3000. That does not include any insulation or inner wall material. I will probably just use smooth one sided plywood for now and then decide later if I want to add something else, it is the mud room.

Just before the beginning of the year I spent a few hours on the tractor and brought in a bunch of dirt for the front hillside. I am making a spot for the gazebo. I figured as much rain as we are getting might as well help me by settling the dirt down into a working platform. Hopefully I will be able to find another day in between rains that lets me smooth out the platform a little better. This will make it a lot easier to compact in the early summer.

Unfortunately, we had a pretty decent windstorm in the last two days and it has ripped the trash can enclosure door off its hinges and spread all of our torn down material from the back porch. There are plastic siding pieces all over the ram pasture. It is quite the mess.