Bathroom remodel prep work

Winter can be seen from our house, the foothills of the Blue Mountains are covered in snow and on top the local snowpack is 175% of normal. It’s 44 F today at our house and the most we get is rain on a fairly regular basis now. It is supposed to rain almost every day this week. Of course I never bother to look at the weather person predictions unless we are spraying or cutting hay so I thought it would be a great idea to move some dry wood around on the farm.

Mr Rainman had emptied out one of the old grain bins and the plan is to get all of the rough cut black walnut and maple out there and store it until it is needed for some project. All of the trees were obtained from family or friends for the labor of removing them from the property. I had them custom cut into slabs at our local mini mill. The hardest part is having the space to sticker them and let them dry out. We have had the maple for over 15 years and some of the black walnut for eight years. I have one massive piece of 10 foot black walnut that is 20” wide with one raw edge and 18’ thick, ten feet long. It has split in two almost dead center so that there are now two pieces with a live edge. It has another 5 years to dry out, you only get 1” per year when air drying. The large crack will help it dry out faster as it is almost 1/2” in width. I wanted to get it all in one spot where we do not go, it won’t get damaged so we can use our other spaces. I have about 1/3 of the old chicken coop full of rough cut wood. I would like to get that wood all moved out, do some slight rearranging in the chicken coop and then I can move out most of the tools and storage from the old house. This will give me an open room for projects near the house. A lot of what is in the old house is in bins for various types of activity. There is a bin for working sheet rock, bin for installing ceramic tile, bin for painting, shelf of finishing nailers and supplies, several bins for wiring a house, various organizers for parts, nails, screws and a shelf for ice fishing. I have not been in 20 years, but there are a lot of mini rods!

Gingerman and I went out yesterday and started to load the flatbed with black walnut boards, 1” thick, then 2” then we got to the 3” slabs that are ten feet long and those are heavy! We got the first load all onto the trailer and had a plan to come back for the maple. The rest of the black walnut is in the main barn off of one of the hay rooms and is not currently in the way. We drove to the grain bin over the sketchy culvert I have in the barn lot. It really needs to be dug out and reset as the water is going through, under, and alongside it. This is causing the dirt to collapse so I keep jamming large boulders alongside the culvert to prevent anything from falling into the gap. I have a couple more years before total failure hits. We ended up needing to take out the door metal supports on the grain bin, these add structural strength to the door so it does not blow out when grain is in the bin. I swept up and as we were finishing cleaning it started to rain. So now our dry wood is getting wet and I did not bring enough stickers to put between the slabs. We hustled and got all the wood in and set some leaning on the perimeter to be stacked next time we try and move wood.

I really want to get this done in the next week so I can build the bathroom cabinet in the current storage room. It would help immensely.

Since it was raining I decided to back to working on the new bathroom vanity. Gingerman helped me and we got the holes for the sink and faucet placed on the dresser top. I had found some boards out in the old chicken coop to use on the dresser transformation to vanity. The dresser is made out of oak but I am not adding oak pieces for the transformation. I will stick with some Douglas fir and stain it. I was able to get the large drawer put together with nails and glue, it needs to spend the night in the office to dry. I will be able to cut the back out of it once dry and it will still work as a partial drawer, over one half was able to be saved. I have a small drawer on the top that will only be about 3-4” deep. I may put a couple of 2” long spots on the side, I have not decided yet as to whether they would actually be usable.

We were fortunate enough to get more baby chicks on Friday from Mr Horse Tamer. He has an incubator and started 30 eggs, we got 29 straight run chicks. I spent Friday evening putting down new bedding, food and water in the baby chicks area for them. One had splayed legs and he told me to tape the legs together for 24 hours and it sometimes gives the hip muscles time to firm up and the chicks will do well. Gingerman and I took the tape off the next day and the chick is moving around and doing great. We had one yellow chick just die but everyone else is doing great. They have a heat lamp and a heat shelter so even though they are in an unheated coop they are staying nice and warm. I decided to use the heat lamp in conjunction with the shelter as it will also keep the water from freezing solid if it gets that cold.

The check came from the auction and we were gloriously surprised! Those 18 whethers weighed on average 98# and sold for $160/each! They killed it, the auction website said the average price for lambs was $55-150. We scored, those sheep looked amazing, the timing and quantity all rolled up to form the perfect circumstances.

Gazebo up!

This was the weekend to finish up the gazebo! The rental equipment came on Friday at 0900, a scissor lift and 45’ boom lift. I got the requisite five minutes of training and I was in control of my own fate. I knew that I needed to get the boom setup first as it was needed to hold the roof up so I could tear down the platform. But I needed to get the scissor lift onto the front hillside first as I was going to park the boom in the corral and all access would be blocked. Luckily, there was a hook hanging from the bottom of the forks so I was able to just use the hook on the boom. I thought the 45’ boom was a little overkill but it just barely reached out far enough! I ended up with the boom fully extended and had to drive the boom forward a few inches to get the needed distance.

I was able to put up a chain attached to two points of the center ring and over the boom hook. When I took tension off the platform I was ready to tear it all down. During the dismantling of the platform I discovered that one side was only held up by a single screw, the other two had failed. The pallet I had built the platform on fell apart into three pieces. I was pretty impressed that it all held together long enough to get the rental equipment out to the house. The best part is they rented it for one day (8 hours run time) and did not pick it up until Monday. So I was able to use it over the entire weekend.

Once the platform was off the Kubota, I drove it out of the middle of the gazebo. I then tried to drive the 4×4 scissor lift with big tires into the gazebo, after having to drop all the protective rails to make it go under the opening, it was four inches too tall. Nope, one wheel kept spinning and it would not go more than three feet. I called the rental company and they sent out the mechanic. I worked on the baler as the new parts came on Thursday. I put the gear on backwards and had to pull it and was attempting to get it on correctly when the mechanic arrived. It turns out that this machine had been having some issues and he did not know about it. It turns out to mostly be poor design. It uses hydraulic pressure to drive all four wheels and once a wheel starts to spin all the pressure goes to that tire! We got the lift into the gazebo by nudging it a couple of times with the tractor forks. I was able to get four more roof panels on by myself for a total of 8/24 that were attached on top ring and bottom to the wall.

Mr Rainman came out Saturday morning at 0700 and we dove right in! It turns out we had four roof pieces that had the upper eight inches cut off! So you cannot bolt them to the upper ring. It was pure happenstance that I installed one on Friday and then Mr Rainman found three more. Once we knew how many we had we spread them out every fifth panel evenly around the roof. The scissor lift had to have a little push/pull help with the Kubota to get it turned inside the gazebo so we could finish getting the roof panels up. We made really great progress but it was starting to get late and we had three panels left. I was tired and wanted to quit, but we were almost there so we stayed and finished the last three. The entire roof was up, all the panels that could be bolted to the center ring were but we were having trouble with six panels not lining up at the bottom of the roof. The roof was too high, it needed to drop about one to two inches on just those panels. We decided to let gravity do its job overnight and come back in the morning and all would be perfect. Especially since we had already bent one anchor by me extending the boom when I should have been retracting it.

It was not perfect the next morning, absolutely no part of the roof had shifted. Now on one hand this is great news, but it still left us with the conundrum of how to lower the roof. Especially, since the wind was blowing 10-15 MPH, I was so glad we finished putting up the roof on Saturday! We talked about going up in the scissor lift and trying to just hang and throw our body weight around to get the roof to slide down. Instead we moved the boom truck around to the back of the gazebo and used the boom to “push” down on that side of the roof. We got all but two holes lined up and ended up drilling new holes for those last couple of holes.

I had this brilliant idea to cover the center top ring with the panel I had cut in half earlier in the assembly process. I wanted to just use one piece of the panel but it was not wide enough. So my awesome idea was to just stack them like a cross at 90 degrees, drill a hole and put an eyelet on top then drill four more holes and put the eyelets in the opposite direction so I could then anchor the new “free” lid to the center ring. The wife was away at church and I was sure this was going to work. The big issue was neither myself or Mr Rainman knew how to tie quick release knot. The second knot I tried was called an exploding clove-hitch knot and it held 60# of metal and let us raise it 45’ into the air with the wind blowing! I wanted to release the hitch as soon as it hit the roof but Mr Rainman wanted to wait until we knew it would work.

We went up in the scissor lift and started working on getting it attached. As we were getting ready to attach it he asks me if we should go down in the lift, walk out and look up to see how it appeared from the sidewalk. I naysayed this suggestion immediately! I was tired and wanted to be done. We got it all tightened down when the wife pulled up and promptly walked over and started saying “no” repeatedly. It was all Mr Rainman could do to not fall over laughing. So we dropped the lift and I went and looked. It did not look the greatest but I did not want to spend a $600 plus for a new cap if I could even find one so I got her to agree to let me use the cap idea as long as I cut the cross into a circle. Of course I thought I had a lot of metal cutting wheels and ended up only having two new ones and two used ones. I got it cut with my big DeWalt 60v grinder. I had half a disc left and only exploded one disc.

The amazing exploding clove-hitch was again used. It was easier to tie the second time and it did work as we tried it out after we brought down the cross. We got the round one up, we dropped the scissor lift, looked at it and then tried to anchor it down. This necessitated a trip to the hardware store to get shorter tighteners. We got six tighteners on it and it is not going anywhere. The knot gave way when it was pulled from the ground, we used 100’ rope and tied the knot in the middle of the rope.

All the equipment was moved out so it could be picked up on Monday. Again the scissor lift required some pulling to get it out of the gazebo but it was a down hill trip to the driveway so I was able to get it out without any more assistance. So it only cost about $1100 to rent equipment and I only had 2.5 hours of run time on the scissor lift and 2 hours of run time on the boom truck. Yes, I do know that I probably should have done that 3-4 weeks earlier. So learn from my hesitancy/cheapness and just rent the equipment early. It is a dang sight safer that is for sure.