Alpaca sheared!

It is that time of year again and I am getting behind on the blog. Last weekend Mr Rainman and I took Saturday to shear the alpaca. Ideally we would have done it a month ago but it was not a true priority yet. We have learned that they must be sheared before the cheatgrass comes to a head or else their fiber just gets loaded with organic matter and it is very hard to shear them when they are filthy.

They will find a dirt patch and just roll around trying to get as dirty as possible. We used to do it midsummer and it did not work out well so we have slowly been making it earlier and earlier every year. I think April is probably the perfect month but it has to be dry enough that they have not been rained on for a few days.

It went pretty smooth this year. There are only eight now, not 12 and that made it a reasonable day. Doing 12 takes a lot of time and effort. We decided early on that we would do the three siblings early as it is only their second year getting sheared. They are still smaller than most of the other alpaca and they were a lot crazy last year when we strapped them down to the shearing table. They all three did amazing! There was no standing on the table and panicking off and on throughout the shearing process. They have wonderful fiber and we have been separating out the fleeces, one to a burlap bag, so that Annmarie can clean them as a single animal, store them and spin them all from a single alpaca. We used to put their names in the bag also but we are over that. She can tell who it is now just by the fiber quality and color.

The babies are changing colors! They were all white and all brown when we got them but now they are turning into a multicolored blend. When we were shearing we noticed the color change happening. Neither one of us got spit on directly. We had one unsatisfied customer who kept drooling stomach contents onto the table and complaining throughout the entire process. The babies need a lot more work on their toenails than anyone else and we had to ground down teeth on three of the alpaca. Next year we are going to have to cut off a few fighting teeth.

I did cut two fairly badly this year, it just happened. The cuts were about 3 cm. Any bigger and I was going to have to suture the skin closed. Luckily, we just slapped some of the blue wound cleaner on it and let them go. Some years it just happens and yes I had sharpened blades. As we worked toward the last alpaca Mr Rainman and I decided that 6 is the ideal number of alpaca. Snoop looked great this year and even being old as dirt I suspect he has another year in him. He is at least 15-16 years old already possibly 18 years old. There is a brown one that is all skin and bones, I suspect he won’t last the year. So the realistic goal is 6-8 alpaca. Usually when we find them for sale there is a buddy for sale at the same time as they don’t do well alone.

Beautiful spring day

Saturday was amazing, the sun was shining and it was a near perfect day. Since it was going to rain on Sunday we opted to just make it a work outside only day. Once the sheep were done we started to look for my set of small discs. Mr Rainman and I went all over the farm. We could not find them anywhere. I ended up mowing all around the upper CRP field. I mowed down by four corners but hit a buried baling twine bundle and had to take thirty minutes to cut it out of the mower blades.

The kids brought down a bunch of concrete from their remodel. We are going to use it to help stabilize the bank. It keeps getting eroded by the seeps, water and sheep. They have at least three more loads and I think that will make a great addition to this corner. We should be able to stop the corner from falling in.

The seven yearling cows that will be sold or eaten this fall got pushed down by four corners. They are in amongst the trees. We are going to start killing the cheat grass in the two fields near the mother-in-law’s house. We hope to get water on them so we can keep getting the cheat grass to sprout then kill it and start the process over.

I was able to sell five, one year old lambs this weekend ($120 each) so there are seven left to sell by this fall. It was very easy as we just pulled them off as we wormed the entire herd. They came and picked them up a couple of hours later. We just ran them out into the corral and down the chute into their horse trailer. The corral makes loading animals very easy.

The gate gremlins were out in force this weekend. The teenager cows got out of the lower pasture the gate was open. The horse got out of the barn lot, the gate was open. The horse got into the ran pasture with the sheep and was trying to eat the green grass, the gate was open. The surprising part of this is that each gate was left open by a different person! No one was harmed and the animals did just fine. This stuff happens.

I was able to get down to field one and mow the newly made ditch. Mr Rainman spotted some fresh coyote prints in the mud. We have not seen any yet this season but they are obviously out there. I went to the other side of the creek and worked on getting it mowed down. I managed to get the huge hole filled in! That has been there for over 25 years. Someone buried two huge track backhoes in there and spent three days trying to get them out. They left a huge hole that was never filled in. The edges of the hole were straight walled and over eight feet high. It is not safe to drive the tractor in that area without knowing exactly where you going and where the hole is located. I got the entire thing filled in and now anyone can safely go back there and mow it down as needed. That has been on my list for over 15 years and I just never got around to doing it. Usually, when I wanted to do it the ground was so hard that I could not move the dirt. I even used the little John Deere 2520 to do it.

Sunday I was able to work on the baler. Unfortunately, I am missing two parts. One that never got sent to me and one I think I sent back accidentally when I sent back the wrong sprockets. I am pretty sure that one is on me. I have the part numbers written down and will get them ordered first thing on Monday. Otherwise, all of the other parts are all installed, tightened and adjusted. I can get those two parts and the new chain on in less than 90 minutes. Mr Rainman did remind me that we may need to do some maintenance on the sickle bar mowers before we use them. I think I have all the parts for those already.

Lambing final tally

This weekend some time had to be devoted to the sheep. It was time to worm everyone. We have to wait until the lambs are old enough to do it and no one else is going to give birth. So we ran them all into the barn and proceeded to run them out through the chute system. Mr Rainman did the snagging and holding while I used the oral drenching kit to just pump some wormer down into the back of their throat. This thing works so much better than drawing up syringes. We also knocked V shapes into the ewes we are going to cull after the lambs are weaned. We marked nine ewes for culling. When we go to pull those nine off of the herd in July we will cull anyone else who is not fat. They will have had access to all you can eat green grass and their bodies should have been able to put the weight back on by then. We already have some ewes getting fat on the green grass. We want to cull hard this year so lambing next January will be easy on everyone.

Mr. Rainman found a two week lamb that was weak and being ignored. We ended up taking care of it for 24 hours as our normal go to person was out of town. We managed to keep it alive despite it not really wanting to eat. It is now with it’s forever home and if it is gonna make it will be there.

The barn got put together, we tore down all the jugs and hung the panels on the walls, put up all of the buckets and feeders. When we go to clean out the barn we will just need to take the feeders out.

We also got the alpaca shearing area all cleaned up and ready to shear. Hopefully, we can shear the alpaca in the next week. They just need to be dry, it rained off and on all day today. We got 1/3” of rain and it was needed. The garden and grass fields needed it. The parts I ordered for the new pump are still not here. I am afraid the tariffs and shipping issues may have delayed its arrival. Hopefully, it gets here in the next two weeks.

  • Date of update- May 11, 2025
  • # of Lambs born – 73
  • # of ewes who have delivered babies – 42
  • # of ewes still pregnant – should be ZERO, but I saw one today that was so fat already. It would have to be an immaculate conception or a through the fence encounter.
  • # of single lamb births – 13
  • # of twin lamb births – 27
  • # of triplet lamb births – 2
  • # tagged male (weathers-neutered) lambs-35
  • # tagged female lambs-30
  • # of bummer lambs – 3
  • # of lambs who died in first two weeks – 6
  • Total # of lambs on farm -63
  • % birthing rate- 174%
  • % production rate -150%
  • % survival rate at birth – 100%
  • % survival rate at 2 weeks (bummers count as death as they need help and leave the farm) – 86%

Spring is here

This is where it gets tricky. Spring is here and there are things to do outside yet our main bathroom remodel is still in progress. I have to stay focused on the bathroom but some projects still have to get done.

The pears and plums are in full bloom but we have had two nights of hard freeze so I am not sure that we will get any fruit! I sure hope we do this year.

I am mowing the lawn with the sheep again this year so Mr Rainman moved our chive planters to the back garden for a week so the sheep don’t scalp them. They tried to eat the roots last year they liked it so much. Unfortunately, our little dog Milo has learned that he likes to chase the sheep. It is cool. Our side fence is not a barrier for our little dog, he squeezes around the end and our border collie just jumps the fence. We tried locking them in the orchard but then both got into the lavender patch and then got into the garden area. The fences don’t seem to be much of a deterrent or barrier. So on Sunday the Gingerman helped me install the side fence. We made it very tall and the dogs are now contained in the garden area. It works great.

Mr Rainman has been spraying 2-4-D and Milestone on the bottoms. He has already managed to spray fields 1-3 and will work on the schoolhouse bottoms tomorrow. He is also going to spray the edges of the CRP ground we just purchased. The weeds are starting to creep in on the edges, so we are going to spot spray and see if we cannot get them stopped. We will also kill a little spot alongside the fences so the weeds don’t choke out the fences. It is way safer than trying to burn the fence lines later in the year.

I had to add a small 1”x2” board on the end of the shelf in the mud room that is over the outside door. Opening and closing the door is causing the items to move closer to the edge and then leap off to their potential death. The board is installed and now you do not have to wonder if something is going to fall on your head when you use the back door.

Annmarie and I have made a list of all current projects and it has ten levels of priority. This actually works nicely as it lets me plan out projects better and if I have a project I want I can add it to the list. Finish the bathroom is priority 1!

Bathroom day 39

The bathroom project is moving forward, it might not seem like it but it continues to grind on. I just have to keep at it and not quit until it gets done. I have 39 days into actually working on the bathroom. It has been 10 weeks since I started the project!

Mr Rainman was able to rub on some Tried & True finish onto the blue pine and it really made it snap. I started on the ceiling one evening and after 1.5 hours realized that I had done it wrong, I had made a gap on the side when one was only needed for the ends. I had to take it all down and do it correctly the second time. This is just the main panels, I will need to get the crown molding on next to marry the ceiling and walls. The crown molding is going to be hard as I will need to be able to drive a nail into the shower grout. I have some diamond drill bits and I think I am going to have to predrill a hole. It will not be fun.

Once I had the ceiling panels in I installed the bathroom light. Of course, when looking at the light I did not check to see what kind of lightbulb it actually uses. It turns out to be some LED with a G9 base. I was only able to find two of them in Pendleton so I ended up ordering more on the internet. It is a little dark in the bathroom, I may end up having to order a brighter light bulb. It may take some trial and error to get the amount of light tuned in. I do really like the light design and the cut glass makes some interesting patterns on the metal ceiling tiles.

We had purchased some slate outlet covers but it turns out, that for some unknown reason, we did not order enough. So I installed the ones we had and ordered three more.

The wife pointed out that I had installed the light switch upside down and then pointed out that the medicine cabinet pull was upside down. I had installed the entire cabinet upside down. I just turned the light switch 180 degrees and it was perfect. The cabinet I just removed the handle and turned it 180 degrees! It is perfect.

I was going to put a shim//toilet extender on to get the outlet even with the tile but they were all very cheap and did not fit the old hole pattern. I opted to get an extra thick wax seal and see if it would work. I had Annmarie help direct the toilet while I moved it into place. I was happy to have to push it down about 1/4” to get the wax to spread out. I promptly filled the toilet bowl with water to stop the smell from coming into the house. I also managed to get three valves while at the hardware store. I will work on installing those next but they require me to shut off the water to the house and drain the lines. I also forgot to buy the decorative wall plates so those will still be needed. So the toilet does not work.

I will get all the crown molding installed before we bring in the bathroom vanity. It will be too crowded to move a ladder around with the vanity in place. The old door will work but I need to glue in a patch first and that is going to take me about an hour to custom cut the fill piece and clean out the hole. It needs to happen also, but I figure until we have a functional toilet I have some leeway.