Farm projects progressing

The siding contractor is done with the siding. We just need our gutter fixed and a screen replaced. Mr Rainman has been working on getting our porch ceiling painted. He used a thick primer to fill in the gaps between the boards. We thought about painting it white but were afraid it would be hard to match our siding. Annmarie remembered the porch ceiling being blue when she was a kid. I had to look up why blue and the reasons vary quite a bit. It was supposed to keep away evil spirits, it represented the sky so it made the porch feel bigger and it repelled bugs. We are going with the first one.

The annual barn clean out has been happening over the last two weekends. Mr Rainman started it by getting a main path dug all the way through the barn (5 hours). I have worked on it two more days a four hour day and a three hour day. We have managed to get most of the barn dug out in 12 hours! This used to take 40-60 hours to do. We started earlier this year and it is really wet still inside the barn, so there are no hard sheets of dried stuff. It is scrap-able with the manure forks. I took the forks off yesterday and used the bucket to scrape the muddy material loose and then just leave it to dry for a while. Mr Rainman had ambitions of finishing it next week. The rest all needs to be hand dug. It should take about six hours.

We will have gotten the whole thing done in under 20 hours which is pretty amazing. I keep getting better and better with the little John Deere tractor. I think the real reason is I don’t want to get off and pitch fork as much crap as I used to, before becoming more aged. I am getting more efficient as I age!

We have been having some trouble with random people coming down the driveway. We had installed a ring camera this year and are now having to monitor it. For some reason we have someone on a motorcycle who keeps coming onto the property. Annmarie is making another sign to do down by the driveway cattle guard. Once we have the gazebo up we are going to install a 16’ gate across the driveway down by the first house. Initially, we are going to keep the gate open and only close it when we work the animals. If we keep getting unknown visitors we may have to install a solar automatic opener with a battery backup. This will force everyone to stop and push a button to open the gate. If we install an auto gate opener we will bury an auto sensor from our side that will open the gate so you can leave. I am hoping that we won’t have to do that but when we install the manual gate I will weld new hinges on the gate and install a double post and offset post for latching. This will make the installation of an auto opener very easy.

We got the side fence temporarily back up so the dogs can no longer steal cat food or harass the cats. This week we will start in on the gazebo! This is our next big project. I am thinking it will take us about six weeks to get it all up in the air. We will still need to finish the floor inside, create countertops and an entrance cover and ramp. For now just getting it up with the roof on it is the goal this year.

I had to order more parts for the micro hay baler. I needed another $500 worth of parts and am probably going to have to pop off the wheel on one side to be able to reach all of the gears. I will definitely be ordering a spare chain and will only allow myself to take out links one time before just replacing it. The chain only costs $150, all of the gears are over $2k.