Bathroom update

Mr Professional came out on Saturday so we could work on the bathroom. I needed to take Friday off to just rest, still getting over Covid and I just don’t have the stamina to keep going seven days a week without any rest. Normally, I just go and go and use my paid job as rest for my farm job. This is most certainly not the case currently and I am hoping I get back the preCovid stamina I used to have.

We focused on finishing the walls and casing out the windows. The top board for the little window will have to be cut and installed after we install the ceiling and crown molding. My hope is we can get the bathroom ready for the ceiling. The stained glass window is going to look great! Mr Professional said that since I installed the stained glass window I was going to want to install a second one in the original opening I had already installed. It took me thirty minutes to find a custom glass shop that would make a window to fit our already framed opening. The internet is a wonderful thing! I should hopefully get it ordered by next week.

The child informed me that she needed to work on our foot bridge for a physics class homework project. She needed to film a reason to use a lever, our front foot bridge has threadall and nuts to adjust the height of the bridge. Our bridge is getting sway backed and the child definitely had to use the lever to raise the bridge. We only managed to raise the bridge about 3/4” at every post and it made a visible difference. The bridge is a lot stiffer now and not as bouncy. I had obviously needed to do this last year! Yeah for education!

Today, Mr Professional and I worked on the ceiling. It is a tin ceiling snaps that snaps together and molds to the contours. It went in super fast and only took us about three hours to install. I only managed to mark up one incorrectly and we were able to use it later in the closet region. It turned out very nice! The color choice that Annmarie picked really brings out the blue in the wood and just pulls it it out in the entire room. We cleaned out the room, vacuumed up the floor and installed the sink stand. We drilled holes in the back of the stand for the drain pipe and both water lines. The sink and top are just sitting on the stand and still need to be attached. I have not attached them yet as I am not sure if attaching them will make it harder for the plumber or easier so I am just leaving them unattached. The natural sealant is coming in the mail and hopefully will arrive early this upcoming week so we can get it on the walls. Once it is up then the crown molding can go on. The closet door and the shelves will be the very last thing that get installed. I actually want to install all the new electrical hardware as soon as the walls are sealed. We have old style push button switches that would have been standard with knob and tube type electrical wiring. The bathroom is really coming together and starting to shine.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s