Day 3 on new deck

Sunday was the big day, Mr Rainman and I were going to finish the underlayment and get ready to lay TREX. This proved to be a futile thought as we just kept plodding along and could not seem to speed up. We had to undo a section and recut some pieces as we had subtracted 1/2’ due to the warp in the board. The pressure treated lumber is not ideal. It has more flaws than normal lumber and is still very expense. We need to keep the distance from the house to the outside of edge of the deck the same along the entire length of the deck. This is proving to be possible but not without a lot of attention and detail work.

We figured out today to get the overhang correct we needed to face the entire outside 2×10 with another layer of wood so there is a space around the beams we can attach the TREX. We watched another three videos today, figured out that we need some starter screws and some colored deck screws, neither of which came in our build kit plans. We opted out of getting the Butyl tape to go over the top of the pressure treated wood, our deck is covered and this was going to cost $500 for 20 rolls of 50 feet/each. There just has to be a limit. We saw the resident bunny rabbit out by the cars this morning. We tend to spot one every couple of years but they never seem to be able to reproduce in any large quantities.

We did not get done with the underlayment! We have about six feet left. The far corner again proved to be a problem. There was no attachment like the other side to attach the deck to the house. We had to run a board over to the stem wall. Mr Rainman dug out the corner near the house and go the concrete pillar positioned as close to the house as was possible. We then pinned it in place and blocked around it so there is absolutely no movement possible in the deck railing. I figure at least one more solid day on getting the deck prepped and the stairs may take another day also. I still need to purchase the riser/run pieces from the hardware store. We will have to set the lower posts into concrete to ensure they don’t move. I want to wait to dig the concrete until we have the riser/run supports installed.

Mr Rainman spotted a large rock chuck up on the hill but it was hiding in the rocks and I could not shoot it. I kept the 17HMR out in the yard just in case the rock chuck came back down to the ram pasture and greener grass. He did not come down, but eventually I walked up behind the machine shed and got a better angle and shot it. We are down five rock chucks near the house. I think there is at least one more.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s