Office progress made with minimal interruptions

Monday I wanted to really make progress on the office. There was no way we were going to be doing anything outside. We did walk around the farm to see how much damage was inflicted by the water and surprisingly, not a lot. The breakaway sections we built two years ago will need to be reassembled and much weaker clips used so they will actually break away this time. The posts and anchors we installed all held!! This was the plan and the reason we put so much work into getting the anchor points installed. Unfortunately, it will take more than a week for the upper fields to dry out due to the amount of water that was on them. Of course it is scheduled to rain again on Thursday or Friday. This summer we are going to have to clean out the willow areas down by the schoolhouse. A huge lake was created due to the amount of debris backing up in the trees.

Mr Professional wanted to look at the pickup and see if we could get it out of the ram pasture and back out to the front driveway. We had to fix the hydraulic leak that did not get repaired and it would barely engage into gear. We managed to milk it along until we got to the front parking lot and parked it. I am not sure how I am going to pick up the windows this week without it. Hopefully, the windows will fit in Annmarie’s car.

I really wanted to get on the office so we went back at it. It would have gone much smoother if the guy cutting the angles could get it right, five hours of cutting and I would get about one out of four pieces right. I got so frustrated I just wanted to hang it up for the day. Mr Professional just kept badgering me and we just kept cutting more boards. It is mighty hard to get those warped, misshapen and cracked boards up on the ceiling. We joked that it we had to pay extra for character. The problem is that is exactly right! The ceiling is coming together and it doesn’t look like a plain old wooden ceiling. It does have character, it will be unique and it will elicit oohs and ahhs. We almost made it to the halfway mark, I think another five hours and the ceiling will be done. We have one more idea that is going to be tricky but its a surprise for the wife.

Plans interrupted, second 100 year flood commencing

Sunday was the day we were gonna really get cranking on the office. It was supposed to rain most of the day so working outside was just not going to be an option. Since we had the new door installed on the new office we could turn on the little heater and get it fairly comfortable inside. I had decided that working on the ceiling was going to be our project for the day. Our rain indicator showed that in the last 24 hours we have gotten 1.96” of rain and the back runoff creek Stewart Creek was running muddy and starting to finally rapidly rise. It was still contained in the banks so I was not too worried. Mr Professional came out and we started our discussion on how the ceiling was going to be installed. It turns out that the Juniper wood we purchased from a local mill has a lot of knot holes and cracks in it. This means there are gaps and holes so we needed the intact old intact ceiling to be able to use the new wood. The best part is the old ceiling will peak through the new ceiling. I wanted to just install it in horizontal rows, while this is fairly boring it is the quickest install. Mr Professional talked me into going across the ceiling in a 45 degree angle. We managed to get about five boards installed when my daughter came out and asked us if we had seen the front spring?

We had not but holy moly! The entire front spring was now a raging torrent. The only way this happens is if the creek has diverted upstream and is flowing down all of the hay fields. Mr Professional and I put on waterproof clothing and started going upstream and cutting the panels loose. The metal clips were supposed to break under pressure of the water. This did not happen, the 500# rated clips were holding back a few feet of raging water. We started cutting the cables and clips or grinding through them to release the water and pressure on the fence. This was done blindly sometimes as the water was very muddy. Luckily, earlier in the week after moving hay I had trouble keeping my glasses on due to all of the sweat. I put on these little silicone wings that grab the ear pieces and wrap a piece of silicone around the bottom of each ear. This was essential to me keeping my glasses during the storm. I cut a panel loose and it scratched across the left side of my face and ripped my glasses off of that side of my face. The only thing that kept my glasses on my head was the silicone piece on the right ear! Mr Professional hollered across the water that I was bleeding. There was a short discussion about the known saying ”all bleeding stops eventually!” The bleeding did stop so we continued on and continued to release the breakpoints in the fence the entire length of the property. There was 8-12” of water across the entire bottom grass fields with three feet of grass, by the time I got to the far end of the field, I was utterly exhausted. Mr Professional had gone back to get the side by side so I could ride back and not walk.

The side by side has some major issues and we have known this. It sounded rougher than normal but I concentrated on drinking water and getting back to the house. Annmarie hollered when we got down to the end of the driveway. It turns out that Star, our only white stripped cow had lain her baby down on the wrong side of the raging torrent of water. We ended up catching the calf, who did not like this and were going to just take the side by side up and around the hill and drop off the calf with her mother. The side by side gave its final cough and died as soon as we got to the driveway. It is dead! It will need some major engine work or a new engine to correct its current state. Now the calf is stuck in the side by side with me waiting for a ride. The pickup transmission problem has it trapped in the ram pasture and it is now pinned between two raging water torrents.

So Mr Professional and Annmarie went to obtain her Subaru all wheel drive vehicle. Clear plastic was tossed in the back of the car, I crawled in and held onto the calf while Annmarie drove us up on the back hillside. I let the calf out and it promptly ran in the wrong direction. Annmarie went out and chased the calf down. It was reunited with its mother and all was well.

I was exhausted. A shower was had, 16 ounces of dip and chips consumed and an hour long nap on the couch was needed. As soon as I woke up I talked the wife into driving into Pendleton to “check on the reservoir level” but as soon as we got to Pendleton we went to Dairy Queen so I could eat a banana split!! I wolfed it down, we went home and it was bed time! Not exactly power food but it sure was comfortable and well received. I was supposed to eat some real food in there somewhere. My scratch got scrubbed clean and bacitracin ointment applied. If It scars then I will have a cool ”pirate” wound.

Office work directed by Mother Nature

Saturday I took the time to eat full breakfast before heading out to the old house office project. I never stop for lunch on the weekends when I am working on the farm. So I try and get my lunch and breakfast calories all at breakfast time, coffee and the occasional water will keep me going the rest of the day. I headed out to the old house to begin work on the wall, Mr. Professional was scheduled to show up in a little bit. He showed up and we proceeded to finish the dividing wall, roughed in the new bigger door opening and then we set the new door! The best part of the day was that we had the new door set, level, shimmed and installed in under one hour! I have never installed a door at any time in an hour. Outside doors usually take a lot longer than that by the time you get done adjusting everything to make the door work properly.

We decided to keep going and installed the door handles. Everything worked except the deadbolt plate will need to be carved out to fit the metal housing that came with the door handles. The weather was off and on rain coming down all day long. We don’t have enough space in the house to bring in the juniper for the ceiling so it is out on the trailer, covered with a tarp. Some of it is getting wet. I figured once we got it all pinned into the ceiling it can dry in place.

I was super stoked about our progress, so much so that I decided to tackle one more project that evening. It was way past our time to clean the instant hot water heater for the house. I had a sump pump that I had to clean the mud out of as I usually use it for water leak hole pumping. I then had to make two more hose fittings to hook up the circulating vinegar up to the water heater. The first version blew vinegar everywhere and I had to redo one of the hose fittings to a new one. I finally got it to work, we have the correct valve setup that allows us to isolate the heater and run vinegar through it. I had to hang out in the laundry room while the vinegar circulated so the hoses stayed in the five gallon bucket. My worst nightmare was trying to mop up four gallons of vinegar off of the floor. So after two hours of cleaning, I unhooked everything and circulated water through the heater flushing all of the vinegar out. The next day when I went to take a shower I noticed a markedly different heat level. The water felt several degrees hotter than it was prior to the cleaning.

Office work

The toad made an appearance today. We hear him and his buddies every evening and morning. I think there was too much rain for him and he needed to get to a drier location. I was looking outside to see how the rain was beating the ground under the eves.

It rained 8/100” last night so haying was off the table during the day which is good because it has now rained a total of 60/100” of rain since last night and it is still raining, over half an inch of rain today. There is no way any outside work is getting done this weekend if Mother Nature keeps this up all weekend. Instead Mr Flow came out and we went to the custom wood mill and picked up Juniper tongue and groove and some more blue pine. While we were loading it onto the trailer the dude working there noticed a transmission fluid leak coming from my pickup. Now this should be impossible as I just picked it up from the shop on Wednesday after they fixed a transmission fluid leak. Yep, they did not clamp the hose down onto the new nipple. It was clamped to a metal piece that was just sittting on the radiator cooler. Hard to believe we did not lose all the fluid moving those bails out of the field yesterday. We came straight home and barely made it around the barn lot over to the old house before having to shut off the pickup, too much hydraulic fluid had leaked out. The pickup is now stuck there until we fix the hose.

Instead I worked on getting the new equipment room completed and Mr Flow worked on getting the new freezer room cleaned up then insulate the exterior walls. I think we are going to leave the interior walls hollow. He even started insulating the ceiling. I finished the equipment room, it was pine on the walls and juniper on the ceiling. We will finish the pine and leave the juniper raw. I started putting up blue pine on the interior wall. My goal is to get the interior wall finished tomorrow and get the front door roughed in. Once the front door is roughed in then we can put tongue and groove along that entire wall. I finally got a hold of the window shop and the new windows should be here on Tuesday of next week. This has been a big holdup for us.

We are looking for a second calf. This morning I could only find Star’s calf and it was with her. Annmarie went down later in evening and the cows all rushed down to the lower area amongst the creek, exactly were we did not want them.

Haying begun kinda

It was been a long week. We had a wonderful weekend away from the farm, which does not occur very often. On Monday, I had to work late and was even later after I went to the supply store and bought woven wire for our yard fence. We have a few more weeks before the puppy arrives and we need a spot to put them initially that is not with all of the bigger dogs, so the side fence has moved up the priority list. We had several boxes on the front porch which turned out to be the wax dipped wood for our honey bee hive. It will need to be assembled. The back gate on the hillside had been left open and once the sheep discovered it they all ran pell mell for the opening. Annmarie went out and got the sheep back in and shut the gate. The back hillside has foot long grass all over it, the sheep are going to be confined to the hillside for quite some time.

Mr Professional and Mr Flex have been coming out all week to work on odds and ends and to get the hay equipment ready. Mr Professional fixed the gear inside the baler, which means I need to explore an overhead lift capable of handling 4000 pounds. It needs to be easy and safe to work on equipment. Mr Flex got the annual chicken coop cleaning done, this is never a pleasant chore. They started in on skirting the old building and our lawn got mowed twice in the same day to get the height down off of the highest mower setting. We could never get ahead of the lawn, it is very prolific this year due to all of the moisture. Mr Professional got our bee hive assembled and the rest of the parts came this week so I set it out where we are going to keep it. I need to turn the entrance so it is unobstructed. This will also put the entrance so it is visible from the kitchen window. I expect us to do a lot of bee watching this year.

We have had so much rain that the barn door warped and cupped inwards. It would not shut once Annmarie got it open. It really needs a little metal bolted to the outside to slow down the warpage. I had to go out and force it shut. It is already starting to go back to its normal shape due to some dry days this week. We got some scrap metal a couple of weeks ago and one or two of those pieces may work to keep the warpage down.

Mr Professional started cutting around the machine shop to test out the new sickle bar mower for the new tractor. I spent one entire evening into the dark turning the cut hay down by the schoolhouse. There is a lot of cheat grass down there, this makes the hay garbage but where we baled the cheat grass last year there is less cheat grass this year and more orchard grass. So we are going to keep removing it from the fields in hopes that we can decrease its abundance. We will over plant with orchard grass also. This seems to be decreasing the amount of cheat grass that is present. It is a battle but if we keep after it I think we can win. We did not cut any of the upper good looking fields because we knew it was supposed to rain all weekend long. Despite that we managed to get 99 good grass round mini bales into the barn for the winter. We are putting them up a lot wetter this year as we had some serious drying out issues last year. We just baled way too late last year after putting the grass on the ground. So we will cut smaller sections this year and not get so far ahead. Yesterday, when I came home I spent three hours helping pick up hay and get it into the barn. I never managed to get changed into farm clothes as I drove right to the field from work. I definitely need some more new gloves. I forgot what it was like to move hay with holy gloves. We feed 4-5 bales every day in the winter to the sheep.

The cows have started having babies. We had a dead calf already, not sure how it died, maybe drowned in the stream where we found it. We have two live ones maybe? Annmarie and Mr Professional claim two, I have only seen one so far. The mothers are notorious for hiding them for the first 30 days. We have opened up the fields near the mother in law’s house in hopes that the cows will bring their babies into the field and we can shut them all in.

The plan is to work on the office this weekend due to the rain. This is bad for the haying side of the farm but good for office progress!!