Experiment a success

Today we went and picked up the sheep from Hermiston. They probably could have gone a couple more weeks but we can maybe start a little earlier next year. It was a success for the land owner and the field looks great. Their first cutting of hay next year will look very nice. We brought all of our light panels from the barn and were able to form a chute to the trailers. Initially, we had a Y setup but the stupid sheep did not want to go through the chute system so we had to push them and do one trailer at a time. We took down the temporary fence and rolled it all up, we will reuse it next year. The field was so wet that no one used the water trough, they just drank from the various low spots that had a few inches of water. We ended up just loading up all of the sheep into the two trailers then drove them to our house. We backed up to the corral and then unloaded each trailer into the corral area and then we sorted the sheep off into three batches. One group went back into the trailer-those were Wil’s, one group to the back pen-all boys, and last group was all females and the two rams. Since we have three pens that worked great and all of us managed a single gate to move them in or out of the chute as they were moved in. This worked great and took us about 45 minutes.

Once Mr Horse Tamer had his and left we sorted off all of the lambs and put them back in with their mothers. We also sorted off the two rams and moved them into Alcatraz. Then we sorted the boys and took 13 off that are already sold and turned them in with the mothers. They won’t get slaughtered until early January. That left us with 18 lambs that will go to the auction next week. This will be the first time we have ever taken any to the auction so we hope it treats us well, but you never know. We had to move the feeders back into the barn and filled them all with hay. We won’t have lambs until early April 2025.

Mr Rainman and I worked on getting the bee shelter completed this week. He got the posts set and frame built. I made a trip to Home Depot and got three sheets of roofing tin at $45/each. The prices for materials these days are amazingly bad. Now is not the time to build a new building. We were able to use up the last of the 1x8x8’ boards on the shelter. We had to go to a board and batten siding pattern as we did not have enough lumber to go over each side twice. It is very loud inside the enclosure when someone is working on the roof with an impact driver. If the bees complain of the noise we can line the roof with plywood to dampen the sound. I will wait for the complaint department to voice an issue before doing this. We did have to put up a panel to keep the alpaca and cows out of the shelter, they had already found it before we had the roof on it and were hanging around. I had opened up the orchard to allow them to come in and knock down the foot tall grass. Now that there are no leaves on the trees they will leave them alone.

We were also able to but the boards on the new rock crib on the corral. It used up the last two rough cut 2×8 inch tamarack boards I had left from building Alcatraz. We cobbled it together and Mr Rainman will fill it with rocks tomorrow and put a panel over the new gate so the sheep don’t crawl under or through it. We used the old gate today to keep them from going through the new gate, by propping it on the inside of the new gate.

We have finally started getting eggs again, we are getting about a 30% production rate which is normal for us in the winter. Wil is hatching 30 chicks for us so that should get us 15 more hens. By mid summer we should be back up to 30 hens.

After all of that today, I needed a nap and I got one!

It’s cold outside

Winter is finally here. It is down in the low 20’s F at night and barely over freezing during the day. So it is not super pleasant to be outside. I have been so busy that I have not done much around the farm. Luckily, Mr Rainman is still cleaning up and working on small things. He was able to get the three posts installed on the corral. The two internal posts required that the old posts get reset and tightened up also. There is not a bit of wiggle in that side of the corral now! You used to be able to grab the rail and move the fence a few inches in each direction. The last thing for the corral is to finish building the rock crib. It just needs some wooden sides and wire mesh inside that to hold all the rocks inside. It will take 4-6 hours to fill the entire space with rocks but by the time it is completed there will be no moving that side of the corral and the new gate will be anchored securely.

The Gingerman spotted that our main gate into the barn lot broke at the base on the hinge side. When the gate was used it was starting to flex apart due to the break. In true farmer fashion, he plugged in the welder, dug around in the scrap pile and dirt to find some old small metal pieces then proceeded to just randomly weld them in place until the crack was repaired. He then tack welded the hinges as the bolts were not holding them rigid. He also raised the gate a few inches and dug out the hinge side so it no longer drags when you open and close it. The gate works better now than it has in 15 years!

Mr Rainman also got all of the holes dug around the bee platform. I had to make a run over to Home Depot last week so I was able to get all of the pressure treated lumber necessary for building an arch over the bee platform. I am going to use the same 1×8”x8’ pieces we used on the inside of the fencing shed to sheet the outside of the arch. I also have some leftover metal roofing from working on the barn that I will use for the roof. The wind just tore up the empty hives we had on the platform. If there had been bees in them I am not sure we could have salvaged them after the storm. The bees are hard enough to keep without us just letting the wind destroy them. We already have a new Nuc ordered for the spring and Annmarie is fairly confident she can split the hive fairly easily now. I would like to see us going into next winter with three hives.

We are still getting ready for the bathroom remodel. I have ordered the tile for the last two walls, which look like linen wallpaper. I am looking at the custom cabinet design for the right side of the vanity that I want, so I can start in on it soon. This has to be wife approved, it will be made out of oak plywood.

I did the cabinet mock up and the wife did not like the single door on the sink side of the cabinet. It will house all the electronics, my electric razor, hearing aids and any other items that need electrical outlets. This will clean off the countertop. So I had to move it to the front. Now I just need to go buy my three full sheets of 3/4” oak plywood. I will have to do the doors last but they can wait for now.

Still no snow

The plague has struck again! Both of us were sick this week and are finally getting back to normal. The kids came down this weekend and we were able to tear down the old bed frame and clean up the other spare room. We then moved the box Murphy bed into that room for company, usually the kids and proceeded to clean out the other room. It used to be Sarah’s bedroom eons ago. We had purchased a sewing table for Annmarie and I needed to get it assembled and set up an area for her to sew. Clothing is going up in price and the quality is not as good so she is going to start sewing her own work clothes. I have two vests that need done and now that I have gained some girth it is a perfect time. My two other ones started to get too small ten pounds ago. I will need to cut a plywood top to go over the top of the two dressers. She was able to find a cutting mat that is 36×48” so I will put that size sheet of plywood over the two dressers and the mat will fit right on top of that. We have a sewing light and I was able to find a lamp for the room but we need another overhead light over the cutting table. I have ordered another draping stained glass light and will put in a new hook for it when it comes. The stained glass lights just do not put out a ton of light. I have started to overcome this by just putting in more lights. I am pretty sure I will be adding a second light to our master bedroom. But I will need to go up into the attic to do it which will mean pulling up some of the floor in the attic. It won’t be as simple as when I did it before the attic floor.

This would have been simple if I had not just used every scrap of plywood I had on the farm inside of the fencing shed! I have to go to Hermiston and order tiles for the bathroom this week so I will get a piece of plywood to cut for her cutting surface. I need to get the tiles ordered and start working on our bathroom vanity and towel storage cabinet. There was a shopping event on Saturday where you could visit six different sites and go shopping for various Knick knacks. Annmarie was able to find a new potential bathroom vanity. This one is a lot longer, a whole whopping 10.5” longer. But honestly, that is a lot of counter space! The old one we were going to use was 33” wide and this one is 43.5” wide. This one is also taller. I like the higher one and think it will make it much easier to use the sink. The new one needs more work than the other one. I need new drawer pulls and all the drawers need new bottoms. I will need to hollow out two of the drawers on the new cabinet. It is doable but I will need to start on it ASAP.

Mr Rainman came out today and we were able to get a few little things knocked off the list. We installed the new Gazebo lights so thy are now remote controlled. We also took the light strand from the Gazebo and mounted it alongside the old house to light up the walkway and cat feeding area. Now when I think there is a raccoon out back I can just flip the light on, via my phone, and I will be able to see the entire area behind the old house. No more hiding for the raccoons. I was able to program the light via my phone so it can be turned on remotely. I just need to get it programmed to come on for an hour every night around the time we feed the cats.

We put the trellis back together next to the house. I will need to train the trumpet vine in the spring to follow the new trellis. The fencing shed anchor bolts came but I could only get four of them to drive in the entire length. I kept hitting something so old and tough that my impact driver would not move the anchor, no matter what I did. So there are now four anchors and more supplies inside the shed holding it down. I am not too worried about it going any whereas it did nothing in the 70 MPH wind.

My windmill got ripped out and tossed on the ground and our old chicken coop door got torn up by the wind. The windmill lost a blade and we put it back up but had to hammer it into the piece of wood so now it won’t spin. So I will need to get another one and this time I need to make sure it has bearings and some way to make sure it does not blow away. The latch on the old chicken coop got torn off. It needs some screws and may need to be rebuilt. It will depend on how rotten the wood is and attempting to repair it will let us know that. At this rate we may be able to get the drying lumber pieces moved out to the old middle granary. It is all cleaned out and ready for wood. Some of the wood has about two more years to dry out. We will be putting all of the maple and black walnut out there.

Mr Rainman has been organizing the machine shed and tossing out all of the accumulated trash. He has been doing a great job on getting things organized again. It is an annual process as I do not do as you go throughout the year. Once we get the old chicken coop lumber moved out then we can move all of the tools from the old house out into the coop. This will then create a single room we can use as project space.

Fencing shed good enough

Friday, Mr Rainman and I worked on the fencing shed some more. Our goal was to keep the rustic look on the outside. By putting vertical boards inside we were able to cover up almost all of the holes in the walls. We turned the boards with the most aged color to the outside and you cannot hardly tell when you look at the building. We pulled most of the 2×4 boards off of the burn pile. They were pulled off of our house this summer when the siding was done. They were the window trim that was covered by metal trim. The old 2×6 boards I put around the bottom were in the building already. I had salvaged them from somewhere and put them in there years ago. It rained off and on all day on Friday and of course it was not a burn day. We have been trying to burn our big debris pile for three weeks and it’s never a burn day.

I got the solar light installed but the thing has a light sensor on it so it will not turn on when it senses too much light! So even though it’s a little dark in the building without lights it won’t allow you to turn on the lights. I had to go out in the dark to ensure the light does work, it works just fine and it is quite bright inside at night.

Saturday was a burn day! We got the last of the scraps from our work on the shed and there was a pile on the other side of the machine shed. The fire started right up and we ended up having to watch it for about 90 minutes until it had burned down and we could work on the fencing supply shed. We ended up going to the old house and pulling all of the leftover plywood from various projects and loading it up for use in the shed. The shed was pretty solid but once we started putting those spare scraps of sheeting and boards the entire thing is now rock solid! Unfortunately, the 12” anchors came and they are not long enough. They will only get into the railroad ties about one inch, so I ordered 14” anchors and when they come we will anchor the building to the railroad ties. At this point I do not see the building blowing over ever again.

Once we started piling up the burn pile we went out to the fencing supply are and dug up another load of rotten wood to toss on the fire. We really need to clean up this entire area but I have fence posts and fencing on the old wooden parts of various structures. It is keeping them all off the ground and I am unwilling to give up this luxury yet. I could lay out old tires and use them instead? It’s an idea and not a bad way to keep everything from rotting or rusting. We still have quite the pile of used tires.

Mr Rainman and I had a spirited debate on how well either of us can eyeball 2-6”. He was on the outside of the building screwing inwards and I was directing him from the inside. This continued for two days and a tape measure had to appear a couple of times to determine who was right and wrong. He is a good sport. Plus, I am working on increasing my fiber and the steady stream of farts was enough to keep him out of the building.

The bill from the plumber arrived this week. It was a mere $120 for the plumber to tell me that the drain shut off valve was closed. Some lessons are hard learned. I am sure everyone at the office had a good chuckle at my expense.

The County soil and water conservation district manager reached out to me a few weeks ago to talk about a grant to install some more fencing along the creek. This works for both of us and I have done it in the past before Covid. He came out on Friday and we walked the property. I am looking at putting some more fence up on the hillside. I already have two sides on a four acre spot done. The only two sides left are along the creek and up the hill. He will work up a proposal and submit it, I would not expect to know for six months if it is approved. This will let the animals knock down the weeds on the hillside also so we can use less herbicides.

We are going to start spraying Rejuvra on the upper bottoms and down by the schoolhouse. We are going to try and get control of the cheat grass. It’s going to be a race now with the weather. We are finally starting to get some regular moisture.

Mr Rainman was able to get my future craft room in the old house cleaned out. We have already started to stage supplies for the bathroom but I am getting ready to order some more tile this week and then we will need to bring down the vanity so I can start working on it. February is going to come sooner than I would like.

Once we had the inside of the shed done I could not help but fill it! I was able to sort most of the fencing buckets and hang the tools on the walls. I have an entire four gallon bucket of loose fencing staples but am now using the DeWalt stapler exclusively. If anyone wants enough loose staples to do 1/2 mile of fencing holler you can have them. I am never going back to hand nailing them! I probably need another two boxes of staples for the amount of fencing we are going to do next year. I did find a bunch of the smooth wire tighteners! I had quite a few, they were just scattered all around. The next thing is for a wall organizer but that can come later. In 2025, we will get the used tin up on the roof and get a solid door built then it will be 100% completed.

Fencing/metal shed

I know I was supposed to be finishing up the winterizing projects. Finish installing parts on the bailer and finish emptying wood out of the old house. We are getting my future craft area all cleaned out so that we can use that as a staging space for the bathroom remodel in February. It already has a sink, toilet, shower head out there currently.

But honestly, I did not want my future fencing tools/supplies and metal storage area to blow away. This building was originally a chicken coop then did duty as a lamb shed. When we had the terrible windstorm that ripped part of the barn roof off it rolled this building about 100 yards. It is odd to see a building rolling across the ground. Even weirder when I was able to move it and it was still intact! Since that time it has tipped over once and spun ninety degrees in place from the wind. I have been wanting to get all of my fencing supplies and tools out of the machine shed. They take up four pallets worth of space and I wanted to be able to put metal scraps and pieces under cover so when I need pieces for weld repairs they are all in one place and not spread out over 100 feet and buried under other crap.

It does not hurt that it is the allure of a new project enticing me to do something. Mr Rainman and I got the last railroad tie installed under the building then filled the one foot gap with an old 2×8” board. We had to chase out one cat before we could get started. I don’t want any kind of animal living under the shed or for that matter in the shed. The door on the building is made out of chicken wire and if I just add a six inch piece on the bottom it will keep out all four legged creatures. We will need to add hardware cloth to keep the little birds from flying in and building nests in the rafters. I ordered twelve inch long deck anchors so that I can attach the building to the railroad ties. They were incredibly expensive at $3.60/each. I only ordered a dozen from the entire building. The additional weight should help keep the building from blowing away, plus putting it next to the machine shed helps break up the wind at least from one direction.

Once we tore off the bottom board on once side and started to clean out the building we realized that if you shake the walls the entire building was moving. This meant we had to look at the bones of the building. There was a roof joist that was not touching the sill plate and one of the sides it had split. It needed two new boards cut and then attached to the old joist. We even squeezed the split joist together and put a few screws in it before attaching the new joist to it. For all the purists out there this is a shed. It has lasted 70-80 years already so I just need it to last another 50 years. We found another roof joist that looks like it broke in half but it was still perfectly aligned. We just slapped another 2×4 up next to it and screwed it in. I had five new 2×4 but we used about 20 to fill in all of the upper and lower sections of the wall. Doing this really stiffed up the old building. We had one soft corner where we installed three new upright 2×4. By this I mean we just toed in another one next to the soft spots. We also put some supports in near the top of the roof to stiffen the roof. I am going to have to climb up on the roof and install a metal roof and I don’t want it breaking. I have some old used metal tin that did not get used up when I roofed the barn. It is old and aged and will go perfectly with the building. I will even reuse the roof cap it currently has as those are hard to find.

My Mother-in-law wanted the building to maintain its old look. To do this we are going to use a bunch of eight inch by eight foot boards that have been laying outside for the last ten years. I bought a unit at a charity auction and have had various projects that I thought I would use them on and never did. The unit had gotten spread out all over the ground and needed to be restacked. It was the perfect time to get boards because they were all weathered. We will line the inside of the walls with the new boards and put the weathered color outside. There are a ton of knot holes in the wood. They had covered the knot holes with cedar roofing shakes from the inside. We tore all those out to get a better fit for the inside boards.

Once we tore off the scraps of 80# asphalt paper, another reason the building probably held together well, we pounded in all of the nails on the outside walls. Surprisingly, the cupping on a lot of the boards was pulled out by hammering in the nails. We will use black screws from the outside to attach the boards to the frame and to attach the inner boards against the gaps and knot holes.

We are going to cover up the windows. I have an old window from the old house but honestly, it’s a shed and I have already ordered a solar, motion sensitive light for the interior. No power required! I had hopes that we would be able to finish it up on Sunday but the rain is pouring down so it is going to have to wait. I love using the tractor as a working platform when cutting a lot of boards. I can adjust the fork height to the perfect working height.

Annmarie spent the day canning spaghetti sauce, we had been freezing the tomatoes and she was able to make three gallons of spaghetti sauce! So now we can have spaghetti every month.