Today Mr Tex came out and we focused on getting the wiring done. We pulled the wires and I labeled both ends very well so I could install all of the outlets and switches correctly. I will also have to install all of the breakers and label them once I am done. I needed to install one triple switch and one quad switch but it has been years since I did it. I thought I knew but ran into the house and got my cheater book to make sure I did it right!! Luckily, we had 12/2, 14/2 and 14/3 wire so I was able to use what was necessary to get all the switches correct. I even went into the house attic and pulled down the leftover roll of 500” 12/2 hoping it would be enough, but it was not. Mr Tex got a list of stuff to do, fix the old bathroom ceiling and plug the window off and the bathroom hole. While he did that I ran to Pendleton and bought another 500’ of 12/2. I had not wired any of the freezers yet. We got wires ran to two freezer outlets. We needed to get my room cleaned out so we could move all of the remodel equipment out of the freezer room. Three of the walls in the freezer room need to be torn out so we can seal the walls and install more outlet boxes, then insulate the walls.



We got everything pulled that we had time for, I have four more cable runs to pull and we will be done with the entire house. I even remembered to add two porch outlets and a back porch light! I think our holdup is going to be the windows that we ordered. No telling when those will come.


Mr Professional came out for a couple of hours and we worked on emptying the second room. We need to be able to stage all of the purchased supplies and get the new freezer room cleaned out so the walls can be stripped out. I need the walls out so we can install power, seal the walls then install insulation.



I keep changing my mind on what to do with the walls and ceiling. I was going to just paint the ceiling and do the walls in pine. I have some 1×6” and 1×10” boards and I was just going to butt them up to each other. This won’t look amazing but would work. I am not going to do that. I am getting tongue and groove juniper for the ceiling and tongue and groove blue pine for the walls. I want it to look pretty! I am even going to install it on a diagonal. It will hit more boards that way but will look prettier also. I will use the plain stuff to sheath the new freezer room walls. We are going to do that room at this stage but it doesn’t need to be fancy. I am even thinking about leaving the original window in the room. I think I will for now and then this summer decide if I need to install a thermostatically controlled vent fan to make sure the room doesn’t get too hot. I am hoping that if I insulate the room well I can keep some of the extreme heat out.
Today, Monday we have had 0.43” of rain in the last day. The wheat looks amazing. Our upper fields are looking amazing in places, last years grass is skyrocketing. We need some warmer weather to really cause the seed we planted in the fall to shoot up. Its about 4” tall now. Last year’s grass is over 18” tall already. Next week we are going to have to stop and focus on getting the sickle bar mower attached and ready and get the baler repaired and ready to go.


















I need to get in the room and clean some more. I want to wipe down the walls and ceiling another 2-3 times to make sure I have gotten all the sawdust off of the walls and wood trim. Once all that is done then I am going to stain the door trim in place. Its a pain to do but I opted to do it in stages as I wanted to get the floor done first. I don’t think I will need a bunch of coats of stain and varethane on the trim. I will probably only do one maybe two coats. Unfortunately, I am not going to put the furniture back in the room until I am all done cleaning. I can do the door staining with the furniture back in place.
It turned out very nice. I think I am going to add 1-2 more shelves in the closet storage room also. I will be able to store stuff all the way to the ceiling that way. I am also going to add a shelf between the intake and output duct. This will gain me five feet of shelf 18 inches wide and 20 inches deep. That is a lot of space! This has spurred me to reconsider building another narrow shelf next to our refrigerator. We currently have all our reusable bags just stuffed into a 7 inch wide gap. To minimize space loss I should use 5/16 plywood. The trouble is I like the look of old doors but that will cause me to lose 3 inches which is too much. So I am still arguing with myself on what to put their that will not cause a loss in decor. I am considering a frame type shelving unit using the old floor kickboards. I found a bunch of them in the rafters of the old woodshed when I was installing the weather station. I just need to figure out how I am going to put them together. That project is going to preoccupy my mind for the near future. 