Rock cribs contain rocks

I realize that this may seem like an obvious statement but have you really thought about it? I had lots of time today to contemplate this reality. The panel would normally cost $24 and the post around $14. Then after filling a couple of rock cribs I can say it takes three hours to fill one! Three hours of knocking rocks out of the ground with the tractor and then hand loading them into the bucket and dumping them into the circle with the mistresses help. She is as hard worker and really needs a bath. After said bath I need to take a hammer and beat out some of the dents and spray a little green paint over her rusty spots. She deserves to be pampered a little every once in a while. I only had one close call today. I had managed to get this humongous rock into the bucket then felt it necessary to throw in more rocks until the bucket was full. I backed down the hill to the rock crib and then lifted the bucket high in the air as I approached the metal circle. Just as I was attempting to tip the bucket forward the tractor went onto three tires and tired to tip over. I managed to keep the three tires on the ground but could not empty the bucket. I finally managed to back up enough to dump the bucket out onto the ground. I had to make three loads with the tractor to get it all into the rock crib. I am now only grabbing one rock when it fills half the bucket. It’s just too hard to control the tractor with that much weight on one side of the bucket. This is exactly why I keep the roll bar up on the tractor and wear a seat belt.

I had Annmarie do the math, there is 84 cubic feet in each rock crib. That is a lot of rocks! A whole lot of rocks. I am hoping to get the last 1.75 cribs filled. Once that is done then I can go put the hole post auger onto the mistress and see if she can drill two holes up on the very top of the hill for the upper gate. If I can get both those holes in I can install two railroad ties and build a H brace. Once the H brace is in I can run fence the entire length of the hillside. This will then let me install the upper and lower 12 foot gates. This will then just leave a ten foot open section on the bottom of the fence near the house. I will need to add another 4 foot circle and fill one more rock crib. If I can get the cribs filled and the H brace built tomorrow then I will be on schedule with the work. I need 35 T posts and 34 wooden stays. There is one more spot I am not sure I can drive in a T post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s