Lone Fencer

I have spent the last two days fencing by myself. My helper, Tex, has been a no show. This has caused me to have to adjust my timeline. Together we can do as much work as I can do in about 2.5=3 days. Alone, I am a lot slower, so I have started concentrating on the things that matter. Getting the posts in the ground before it freezes matters. So yesterday I staged all the supplies we had in the back of the pickup and started to clean out post holes by hand. The tractor auger can dig them but they still need to be finished off by hand. I needed the pickup empty so I could bring the railroad ties then a load of gravel into the lower field. The trailer will not go up the hill. I figured out how to load the railroad ties with the tractor today. I was just going to dump them over the side but if I slid the tie down I was able to catch the end of the tie under the top edge of the bucket and just lift it up longwise. This let me just slide it in the end of the pickup! It worked great and meant I only had to slide the tie by hand about three feet. Unfortunately, I had to unload the ties by hand on the other end but only having to lift it once instead of twice was an improvement. I put ties in all the corners and filled the first stretch of fencing. I want to get a section done then move onto the next section. I will leave the wire install as the second to last step, installing the gates is the last step. Wire can be installed when the ground is frozen, posts cannot be pounded into the ground by hand when the ground is frozen. I am learning to prioritize.

I set all the wooden posts in gravel. It just makes things easier and the posts stay tight. I put seven tractor bucket scoops in the back of the pickup. I only needed about 5.5 to set all the wooden posts but the leftovers went over the newly installed culvert. It is still a mud pit as it keeps raining every day. I am hoping the gravel mixing into the mud will make a nice hard surface eventually.

I got the first section all ready, T-posts are installed and this time I even managed to keep them in a straight line. This section goes to a six foot gate, I of course purchased a eight foot gate. Luckily, I have an extra six foot gate on the place already and will use the eight foot gate somewhere else in the future.

This picture below shows the first section of fence I am installing, it goes from one end of the picture to the other. Directly in the middle of the picture is a lone bush along the creek, that is where I am at with T-posts. So I am about half way on them, but tonight after finishing setting the wooden posts I started to pound in T-posts again but I just ran out of oomph! I hit that last T-post about 25 times and knew I was done for the day.

The baby chickens are growing! I had to raise the self waterer another 1/2 inch. They have to be able to reach up to peck at the nipples or it doesn’t work right. This week they are going to finish off the first 50# bag of crumble food. I will need to buy another 50# and then hopefully after that is out I can go to pellets. We are getting 3 eggs a day from 8 chickens now. The 23 chicks won’t start laying until spring but then we will have 30 laying hens! We are only selling about 3-4 dozen a month now.

We ordered the trickle charger for the side by side. The battery is dead and I cannot start it. I am told that this is a common problem for UTV. The trickle charger will stop it. This means I need to wire in a 110v outlet near the side by side parking spot, so I brought all the stuff to wire in lights and switches and once the fence is installed I will be wiring lights on the tractor and lights in the machine shop.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s