Alpaca are done

Thursday was the day the alpaca were finished. The boys came out first thing and we continued the routine. My back ached from the previous seven hours so I made them do all the lifting. I was the “skilled help”. The fact that I managed to cut all three of the alpaca is irrelevant. The boys kept trying to one up each other and Mr. Manners made the sidekick ask for help after he popped off that he could catch and halter an alpaca by himself. He could not and was reduced to having to ask for help twice before it was forthcoming. The boys were slow moving the alpaca to the shearing table or word had been passed down the previous night about the potential for a scalping because the last three laid down on the ground immediately!  The boys had to get on each side and grab hair and lift the alpaca to the shearing table, shove a knee under their belly then lift the shearing table into a horizontal position. I tied the head to the corner of the table. It was a crucial job that required minimal effort. 
Our hoof trimmer blades started to slide apart each time I went to use them. I made them work and even tightened and them loosened them nothing seemed to help. I just kept using them and told myself we were almost done.  I had the same problem with the last shearing blade. I swapped it out and could not get it to cut. I tried metal cutting blade instead of ceramic but that just made it worse. I finally went to an old used blade and a new ceramic blade. This is the real reason I cut the last three alpaca at least that’s what I tell myself. Although in all fairness it does make a huge difference when using a sharpened blade. I am going to buy one more comb blade and only use the ceramic cutters. I will order it all this year when I get these blades sharpened. The alpaca were filthy!  They had rocks and dust at the base of their necks. We have ten large burlap sacks full of saddle hair and ten garbage bags full of seconds from neck and legs.

 We want to get the good stuff woven and the seconds made into hair mats, felted type. The big question now is how much will that cost and how many pounds do we have. We probably have 50 pounds at least at about $35-40/lb to process. So we are going to have to plan that expense. We have to buy 35-40 ton of hay this year so that comes first. 
I will pick up hoof trimmers soon and throw out the others so I will be ready next time. I am learning it is better to get everything you need for next time immediately so you don’t forget anything and when you do it next time everything you need is at hand. I don’t want to store the gunny sacks just because of the mice. 

I made the boys move the shearing table into the barn. The thing is a beast and it was not easy. I had to help Mr. Manners with his end of the table. He needs to do more strengthening exercises. It is now living in a corner of one of the hay rooms. Doing the shearing in the old milking shed area kept the sun off of us. I need to lay out the tarp over the dirt next time. We had one alpaca flop off of the table like a fish and it was still tied up by the feet. The ropes were not tight enough and we had not stretched out the animal. Plus, I might have just cut them with the shaver. The hair cuts got better looking the more practice I got. 

Table works!

It is official, the shearing table works!  I had Mr. Manners and his sidekick came out early Wednesday morning to help. They had car trouble but called ahead and still made it less than 30 minutes late,  a diligent effort. We grabbed the shears and blades out of the laundry room. They have a little metal briefcase to store them in with all the blades. At this point the blades are approaching the cost of the shearer. I have four sets of blades now and this year I got ceramic cutters which last a lot longer than the steel ones. Unfortunately, they cannot be sharpened. I am going to try all steel next time and see how long they last. I managed to shear three alpaca per set today. We got 7 of the 10 alpaca sheared today. 



AnnMarie got a live action shot of me actually shearing. The boys all think I am crazy for wearing a long sleeve shirt in the summer. After a few hours of dirt and hair flying around my long sleeves started to look good. 
The very first alpaca we sheared screamed the whole time and kept spitting all over the table. I kept making the boys clean it up. They kept trying to pass the buck on that duty. I finally had to tell them to just get it done. They started swapping turns after that. I also did not think to take the harness off and trim up the neck and head so the first animal looks a little worse than the rest. The bald patches were not caused by me. I 

Mr. Manners is sorting the hair. We kept the saddle intact and placed it into gunny sacks and put all the other cuttings into bags to be made into fiber mats. 

The blanket belly strap did not work. It just gets in the way and the dirt piles onto it. Plus the first alpaca got frisky and tore it in half. I just took a knife and cut it off. We just got the alpaca next to the table, two people reach under its belly and grab the table edge then tilt it to a horizontal position.  We tie its head to the eyebolt before tipping the table. It works pretty slick. I then clip its legs to above the knees and then tie its feet together and stretch it out along the main pipe. 



I started to get better with more practice. We also removed the halter so I could clean up their face and neck unimpeded. 

I wanted to get these seven moved into the ram pasture but they would not go. I tried the dogs without any luck. I finally gave a chunk of rope and the halter to the boys and I took a chunk of rope. I got the first one snagged and literally had to drag it kicking and screaming across the bridge. I ended up catching 4 of 7. The sidekick caught the others and Mr Manners caught Zero, Nada, Zip. He will have a chance for redemption on Thursday morning. 
Our farm is the blob in the lower middle of the picture. AnnMarie took this on one of her recent morning walks. 


Table done!

Sarah and I worked on the alpaca table today. I had gotten more supplies and more cut pipe on Thursday. She had to run to the local hardware once for bolts and then I had to go a second time!!  One would think I could count. Sarah learned how to put galvanized pipe together today. She had to assemble and reassemble pieces a few times. It was a hot and miserable day. We had to modify the table design on the movable leg. To create the H brace we needed to have a right and left handed thread on the same cross piece. We had to use tape to hold it together. This would be why the plans talk about using fencing clamps. 
I need to write all this up and make up some new plans but I probably won’t. I may out curiosity find those weird pipe fence clamps. 
 
Sarah insisted we eat lunch in a timely fashion. We had lunch at 1215. I had plans for us to still sort cows after we finished the table. We went back outside and finished up the table. The thing is super heavy. I tried to start the gas tractor but the battery was dead. This would be why the negative terminal connection used to be removed. I need to charge the battery and put it back on the tractor. 

We tried to move the table. No way!!  I went and got the Mistress and she carried it over near the barn. It was so heavy and hanging so far forward that the rear wheels kept bouncing off the ground. Once outside the milking area we had to shovel horse poop before we could move the table inside. It was super heavy and Sarah was petered out by then. We wrestled it into place. 
No cows today. We went inside and laid in the living room floor. We were hot and I took off my glasses and laid them on the floor. I kinda fell asleep but noticed the puppy next to me chewing on something. It was my glasses. I tossed them up into the couch and laid there a while longer. He had been at the glasses a while. Both ear pieces a chewed up. One is barely there. I am missing a nose piece and one lens looks like I was in the movie Birds and the only thing that saved my eyes from being plucked out was my glasses. I have scratches and teeth mark over both lens. One lens is providing about 60% clarity. It’s like looking through glasses someone licked after eating ice cream or drinking milk. The worst part is we leave for Taiwan in a week. I am not sure I can get them replaced before then. I did need new glassses but had planned on taking care of that when we got back from Taiwan.  
  

Tile work is done!

Well I did it I finished the floor in the library. I even managed to do it before AnnMarie got back from Berkeley. I stayed up till 0130 Thursday night working grout in and washing it off tiles. I ended up with a large blister in the palm of my right hand. I should of thought about rubber gloves but it took me almost five hours to complete. I don’t think the gloves would have stood up and if they did my hands would have looked like raisins with multiple blisters from all the moisture trapped under the gloves. I showered before crawling into bed. I was supposed to be off all weekend but I messed up the work schedule and got called in to cover a shift the next morning. It was my own mistake. 
Unfortunately, the tile makes the room look like it needs something so we will now be picking out some new paint schemes for this room. I think I want to keep the ceiling the same and just paint the walls.  We will have to get sample cards and get this completed at the end of July so we can move the loom out of the living room. We have the book shelves stashed in the office upstairs. The goal will be to thin everything before it goes back in the room. 
Having to work on Friday threw off my alpaca shearing table build schedule. I went in today and had them cut another ten pieces of pipe and they recut my two 48 inch pieces into five threaded pieces plus cut another 5 threaded pieces for me. It is in the low 90s today and the pipe was in the bed of the pickup so it’s really too hot to handle. This means first thing in the morning I need to get out there and finish putting it together. 
 

 

Alpaca table that would be

 
We need to shear the alpaca. This is going to be facilitated by a table. The trouble with a table is the only directions we have is a diagram from the Internet posted a few years ago. There were no instructions and they did not show the connectors needed to attach it all together. Instead they talked about some kind of clamp that let you clamp sections of pipe together without threading them together. This was not something the local hardware store had in stock. I sat down at the kitchen table and tried to figure it out. I wrote up a list and purchased said list. Today, I attempted to assemble said pieces. This did not go well for me. The diagram did not account for the added joint lengths. This threw off everything and for some reason unbeknownst to me I had the legs cut as 48 inches. On hindsight, this was because I was following the flawed diagram with the weird unavailable clamps. What I really needed was 24 inches x4 not 48 inches x2. So after putting things together as much as possible I took inventory. I had five extra joint pieces and am short two T pieces. I can have the 2-48 inch pieces cut to 3-24 inch pieces, 1-14 inch piece and 1-10 inch piece. Plus, I will need 5 more 14 inch pieces and 3 more 10 inch pieces and 4 2.5 inch hangar supports and I will need 8-3.5 inch carriage bolts. And 8-3 inch carriage bolts. 
So off to hardware store again tomorrow and another $100. 
The 2×4 and 2×6 bolted to the plywood are to stiffen it plus I will be trapping my central pipe shaft between the two middle boards by clamping a 2×8 over the top of them. The boards are 1 5/8 inch thick and my pipe is 1.5 inches. It should work. In the eventuality it doesn’t I can always rip the middle down on the 2×6. It will fit eventually.