Haying done!

It has been a long summer and it is just getting started! The heat has been incredible. We had a new record high, 116 degrees F. This is an amazing amount of heat and one which normally would have had us hunkered down inside our house enjoying our central heat/ac via heat pump. Yeah, Lady Luck struck again and we had air conditioner issues. The worst kind of issue, the gradual change. As the heat kept increasing every day our heat pump kept losing temperature differential and the house just kept getting hotter. Our house got over 90 degrees and three days after we called a repairman out he came! I consider this a success, but we found out our system has a coolant leak and some valve that needs to be replaced and it turned out to be a factory order so we may get it fixed 8 days after discovering it. If its only 8 days I am going to take it as a win. The heat is now under 100 F and at night it is actually cooling off so we have a huge fan that goes in the breeze porch and sucks in all of the cold air and blows it everywhere via the upstairs hallway. We had to have some relief as Annmarie was sleeping at her moms and I was staying up late or getting up early trying to open the house to get it cooled off.

It turns out my mother had an air conditioner for the shop that she was not using. We thought abut putting it up in our bedroom but it really needs some external support. We ended up putting it down in our craft room with the Murphy bed! That bed is turning out to be on of our great purchases of the year. It is getting a lot of use. I had the saw set up and an old table I had not yet discarded and in an hour we had the stand built and the air conditioner installed and blowing cold air! It was the best nights sleep I had had in one week. The house only got to 79 degrees with the new setup. This is much better than 90, sweat does not run down my back just sitting in the living room now.

Friday was a lazy day for me. I don’t have them very often but it has been a long stretch at work and all of my helpers were busy having lives. So I started the day off by making waffles. I got 2 and the chickens got 4. They fought over theirs more than I did. I binge watched Netflix, I still didn’t manage to finish my TV series, it even has a second season so its going to take some more time. I did spend an hour trying to get our yard sprinkler up and going. I had it apart three times and managed to blow rust, and water all over my face and shirt one time. I did get it up and working eventually, that was my big feat for the day. Annmarie and I even went into town and had a sit down dinner, which hasn’t been happening much with Covid. Our local bunny rabbit makes a showing almost every day now. I see it hopping around and we even saw a covey of Hungarian Partridges (Huns) with babies in our driveway. All of the animals seem to have done well this spring.

Mr Rainman came out today with his wife, Gimpy today to help me pull in the last of the hay off of field #1. There was quite a discussion had, some whining, about my choice of names for helpers. A final ruling was made that a name is given on the very first day you come out to the farm to help and it is never altered. Yes, it may not be as pertinent but unlike your birth name there are no do overs or changes allowed. So Gimpy, without the injured leg, helped load hay today. We pulled another 174 bales off of the field. The best part of this was that our main barn was full so we had to use the lamb shed. What a sweet deal!! Mr Rainman said if I just tossed a round bale on the edge of another by the trailer it would spin and then roll all the way across the ground to the hay stack. This worked fairly well but during the second load he suggested we use the trailer tail gate as a ramp, pure genius and worked perfect! This made unloading super easy. Gimpy decided that the owning a farm was not in her future.

We had a Rock chuck lay out on the wood pile for the first three trips, I finally went into the house and grabbed the 17 HMR and of course we never saw the little varmit again. It was fairly obvious that we had issues with baling hay in field #1. There were just under 100 failed bales that had been jettisoned out of the baler, almost 2 ton. We went around and picked up all of the rolls and fed them to the cows/sheep in the upper pasture. It will take them a couple of weeks to go through 2 ton of feed. This puts off my building fence for a short while. We ended up getting just over 800 bales off of field #1. I think if the weather had not gotten so hot we could have gotten 1000. I am going to spray it with 2-4-D soon after we run the mower over it.

Mr Rainman is going to come out early this week after the holidays and mow down a bunch of cheatgrass. I am hoping to put the hurt on it on Monday. I will stick to the fields around our houses. The front porch has gone no where. So we laid down the same OSB sheets we used to have on it so we could use the front door again. After we get back from our week long respite I am driving to central Oregon to pickup our new ram. He will have a buddy as we are also picking up a ram for the farmer buying 28 of our lambs and starting up his own herd.

Haying forever

It has been an incredibly long week. I am supposed to make several posts and spread out all this information but honestly, I just don’t have time. The weather is against us, we are under a “heat dome” now and it is currently 108F. It is supposed to get to 115 and may last for at least ten days. It is absurd, our heat pump is not keeping up so we are at 75 degrees inside the house it may get to 80 by the end of the week. It is definitely not the pleasant 72 degrees we usually keep the house at during the summer.

I did have a lot of help off and on throughout the week. Mr Rain Man came out at 0530 on Tuesday to help me with baling of the hay in field #1. I had no idea how much hay was in that field. I think we are going to get about 3.25 ton/acre. It is our best performing field for sure. The problem is we keep hitting moisture issues and its making it hard to bale. Mr Rain Man had never ran any equipment this small but due to the heat he could only work until around 1100 in the morning. He did this for two mornings until he got a piece of something in his eye and had to spend a couple of days irrigating it. I blame the contact lenses. He came out on Saturday to help move a little hay.

I managed to bale hay for a few hours one evening. We have over 800 bales on the ground and have still not managed to get all of the loose hay baled yet. The front porch is a dream, I have been focusing on trying to get the hay bales off of the field and into the barn. But its taking so long due to the heat that the porch is on hold for at least two more weeks. Annmarie and I are actually going to leave town for a week. I ended up working all day at my paying job on Friday so was unable to do any farm work.

Mr Professional came out and got the hay rake repaired and welded together one late night after it cooled off. No one wants to work in the heat, its miserable.

Mr Rain Man, Mr CrossFit and Mr I Need a Belt Bad all came out on Saturday. Mr Rain Man came out at 0530 and started baling hay. Mr I Need a Belt Bad came out at 0730 and spent about 45 minutes weeding the back garden. He forgot to bring a long sleeve shirt and he knew we were going to pickup some hay. It’s going to be a miserable day. We grabbed the pickup and went out and started to fill it up with bales. Mr Rain Man went back to the house with us as he was just not getting the hay to feed right. All of us unloaded hay, I did more supervising than working. I did provide some verbal instructions for Mr I Need a Belt Bad related to inertia and lifting with shoulders and using a knee to keep the bale moving. This “feedback” was continued for two days to give him an edge. It’s hard to keep up without using all the available muscles to the best of your advantage. He is starting to catch on. He should have it down by the time we get all the hay done!

Mr CrossFit and I worked on getting three 3’ wide barrier cloths installed between the raspberries and blackberries. We did this after moving hay on Saturday. We had plans to set the lower railing posts in concrete also but after doing the barrier cloth it was too hot to do any more work. Annmarie wanted to cut down on the weeds and it just so happened that one of my coworkers was getting rid of some rubber bark! There was enough donated rubber to do about 2.5 barriers and we used a few bags of leftover from the lavender patch. We only have about 7 bags unopened now and I will need to put them out on the lavender patch so the sun doesn’t eat the bags.

Sunday, Mr CrossFit and Mr I need a Belt Bad unloaded a pickup load into the barn and then we got two more loads. Mr Professional and a helper came out Saturday night and loaded in 110 bales into the barn. We got another 3 + ton into the second barn bay today, so 5+ ton into the barn in the last 24 hours. There was so much hay that the last load we closed the lower doors on the barn and opened up the upper doors. The hay had to be tossed up to the overhead opening. That electric 16’ hay elevator really needs to get repaired! Tossing them by hand is not easy and Mr CrossFit was moving as fast as he could to get the bales loaded as high as possible. Mr I Need a Belt Bad took more instruction. He is hanging in there. Honestly, hard work and perseverance are the key to success and should be fostered. As long as he keeps working and trying he is welcome to come out. After we get the hay in we will need to start digging out the barn, which is a miserable and smelly endeavor. I would not say that I am the easiest boss to work for, I do provide instruction and set expectations and provide feedback. The feedback can be colorful but it does get the point across.

Day 3 on new deck

Sunday was the big day, Mr Rainman and I were going to finish the underlayment and get ready to lay TREX. This proved to be a futile thought as we just kept plodding along and could not seem to speed up. We had to undo a section and recut some pieces as we had subtracted 1/2’ due to the warp in the board. The pressure treated lumber is not ideal. It has more flaws than normal lumber and is still very expense. We need to keep the distance from the house to the outside of edge of the deck the same along the entire length of the deck. This is proving to be possible but not without a lot of attention and detail work.

We figured out today to get the overhang correct we needed to face the entire outside 2×10 with another layer of wood so there is a space around the beams we can attach the TREX. We watched another three videos today, figured out that we need some starter screws and some colored deck screws, neither of which came in our build kit plans. We opted out of getting the Butyl tape to go over the top of the pressure treated wood, our deck is covered and this was going to cost $500 for 20 rolls of 50 feet/each. There just has to be a limit. We saw the resident bunny rabbit out by the cars this morning. We tend to spot one every couple of years but they never seem to be able to reproduce in any large quantities.

We did not get done with the underlayment! We have about six feet left. The far corner again proved to be a problem. There was no attachment like the other side to attach the deck to the house. We had to run a board over to the stem wall. Mr Rainman dug out the corner near the house and go the concrete pillar positioned as close to the house as was possible. We then pinned it in place and blocked around it so there is absolutely no movement possible in the deck railing. I figure at least one more solid day on getting the deck prepped and the stairs may take another day also. I still need to purchase the riser/run pieces from the hardware store. We will have to set the lower posts into concrete to ensure they don’t move. I want to wait to dig the concrete until we have the riser/run supports installed.

Mr Rainman spotted a large rock chuck up on the hill but it was hiding in the rocks and I could not shoot it. I kept the 17HMR out in the yard just in case the rock chuck came back down to the ram pasture and greener grass. He did not come down, but eventually I walked up behind the machine shed and got a better angle and shot it. We are down five rock chucks near the house. I think there is at least one more.

Moving on to decking

My helpers finished getting in the last two tons of hay into the barn this week. We managed to get one ton of grass hay just off of the area around the school house. Even with help and me doing the driving I was done last weekend by the time we got the hay into the barn. Mr CrossFit ran the weed eater and cleaned up the berry area. The grass and weeds keep growing back. We are going to lay down some ground cloth and cover it up to keep the grass and weeds down, eventually. It’s on the list but not a super high priority. It was time to shift gears and move on to the next project.

The front deck needs to be finished and TREX deck applied. I had all the TREX laid out by the house and thought I was ready to go. Friday morning, Mr Rainman came over to help, he unloaded the pickup with my daughter and then we went to town to buy more stuff for the deck. Another $1000 and we had more lumber and concrete blocks. We unloaded everything onto the yard pile and started in on making the deck underlayment. The price of TREX and building supplies is really high. I know I keep reading about it but a project I planned two years ago was going to cost $6k in materials and now is costing $10k in materials. It is crazy, I have had to shift some money I was saving for the old house remodel to the deck project. This is making the old house project look mighty lean!

We started to install the support framework. This did not go fast and we kept having to stop and take more measurements. The corner beam had to be moved in an inch. We had to stop, make adjustments and keep the width the same every time we moved forward. This sounds easy but it is a constant battle. We did not get very far on Friday. One of the beams had about 20% dry rot and had to be dug out, we ended up cleaning it out and filling the holes with concrete.

Saturday was the day to get completed! Mr Rainman came out and we started in again. I had him doing the cutting, which involved carrying and delivering the cut wood to the job site. I stayed in one place and hollered out measurements. We set posts for the railing, this involved digging a hole, filling with some gravel, setting the 4×4 concrete footing block then centering the block. Once we had the block centered we sandwiched the 4×4 with 2×6 pieces to keep it from moving then I even filled in the other two sides with wood and shims to lock it all into place so that there is no way the posts can come loose!
It got hot on Saturday so Mr Rainman was in full force, we discussed the need to drink more water. Neither of us were drinking enough to pee every hour, but I was ahead. My wife was sticking her head out the front door and ensuring that my water consumption was sufficient. He was on his own.

That evening we went down and pushed the sheep up into the barn lot. The dogs did all the work, we just plodded along. Once we had the sheep into the barn we sorted off all of the babies. The youngest set of twins were not quite three months old. It actually went fairly smooth and we sorted off a nice big lamb for one of our customers. They took it home in a dog crate and Annmarie overhead the spouse telling their partner that “this one is food”. They now have two pet lambs from last year that are now no longer lambs. We pushed all the lambs over into the ram pasture but it is looking pretty eaten down, the sheep will need to be let up above into field #4 with the cows this week.