Micro Hay equipment, its a thing

Well Tex came out this morning and while we were eating breakfast “Slim” came out. She is Tex’s little sister and she has agreed to dig out the chicken coop and the barn and do a few odd chores this summer. I set her up with instructions on how to clean out coop, we found all the tools and I got her some bleach, a rag and a bucket for after it got cleaned out. Tex and I went out to the machine shed to attempt to get the micro baler hooked up. This proved difficult at best as the first PTO shaft was too long, so we added the quick connect to get three inches more away from the tractor. The PTO shaft just did not want to go on. We then had to change out the posts and adjust everything to get the dang thing lined up correctly. We also had to put in a quart of gear oil into the baler. I was a little surprised by this as the thing is brand new and has not been leaking at all. We managed to read the instructions a couple more times and drove up to the second field to try it out.

Tex went with me as we figured there would be a learning curve. This was a major misstatement as we managed to only make two bales in the first hour and could not get either one of them wrapped in twine. They were totally naked. We managed to shear off two shear bolts and discover that a pair of spring wire pliers are needed to correct this issue. I do not own a pair of said pliers so I did it by hand, which is never fun. I finally got three bales done correctly and Tex went off to work on the machine shed while I tried to figure it out.

Tex outsmarted himself as doubling the row widths caused a ton of problems. The rows are too wide and too much material is present. We would have been way better off had he not done it. It made baling it a lot harder. I spent 3 hours on the tractor and got 119 bales done. Two boxes of baling twine are not going to be enough. We are using a lot of twine. I managed to mess up two bales and had to lift the dump part manually twice. The second time I had to go get Tex, damn thing is just getting heavier and heavier.

Each bale is supposed to weigh around 50#, I went down to the machine shed to get Tex so I could show him how to bale and give him some tips to avoid issues. He was working with Slim and they had gotten 8 sheets of plywood up on the walls. I showed Slim a few more things I wanted done in the chicken coop and she set right to work. I had told her first thing this was only a one day job and she did it! She just dug in and did the job!! So nice and refreshing.

I ran back to town and got 10 gallons of diesel and 10 more rolls of twine so Tex will be able to hit it hard first thing at 0900 tomorrow. When I come home from work I will relieve him and go until dark. The race is on now to get it all done. It does not look like we already have almost 5 ton of hay baled. I think we are going to have over 1000 bales in just the first field only.

It must be even

It had rained the days before so we did not want to cut any new hay. Instead we planned on turning hay. I had a funeral to go to so we got Tex all set up with our new 5 foot power rake. He will turn all the hay this Saturday. This rake will let you pile it all up into a row. I had visions of Tex just following the rows that the mower created. he did one better! He went down one side of the row then at the end of the row he turned around 180 degrees and went the opposite direction allowing the row to double in size and cut the number of rows in half. This was very clever and not something I would have thought of had I done the turning.

Before I left in the morning Tex and I planned out our needed improvements to the machine shop. One of the rafters is broken, we need a bunch of plywood to line the hay room to keep the round bales in and the loose hay out of the new gravel area. We also need to install the bolt and screw organizers that were laying on the floor of the machine shed. I need to get all the bolts and screws organized and out of the multitude of drawers I currently have them in. I am also going to hang some bin organizers on one wall. I need to mount these to a sheet of plywood, so we will be hanging a few sheets up on the walls for future use. We also need to make legs for the new free countertops I managed to snag on the way home this week. Every once in a while those “Free” signs are a big win.

I went to my least favorite big box store and picked up plywood and lumber with a few Knick nacks. I had to wait 30 minutes for help loading plywood as there was only one guy who could do it. There are reasons I dread Home Depot, but I spend so much money there I get the zero interest for 6 months on my charge card and always pay it off in time. I love that deal!! Plus on Saturday at 1600 there is no other place in the area open to buy lumber.

I knew I needed some more baling twine, but with micro equipment I was unsure where I was going to get it. The salesman on the phone seemed to think I could get it anywhere. So I found it at a local store and bought two small, 5000 feet rounds. They did not have Jute cord like the free roll I got with the baler but they had lots of types of plastic cord to pick from. I was not sure if they would fit but its all they had and something is better than nothing.

When I got home and published the blog last night Annmarie spotted the uneven gates on the new stretch of fence. She mentioned that would need to be corrected tomorrow. I told her hay came first but I would think about how to fix it without spending 10 hours reworking two rock cribs.

Haying virgin

The farm parts place came through in spades! My new driveshaft came in on Monday and I was able to pick it up that evening. Now it was 28″ and would need to be cut down but I had purchased a grinder that went with the new 60V DeWalt battery. It is amazing! There is no noticeable difference between the battery grinder and a plug in one other than pure convenience. Electric tools had to be able to get there eventually.

On Tuesday afternoon I cut the driveshaft, attempted to install it and had to cut another 2″ off to make it fit properly, this took a while. I was now ready to cut some hay!

This is me ready to cut some hay. I spent another 30 minutes on the internet and watching YouTube videos trying to figure out how to rotate the drum to behind the tractor for transport. I never did figure it out. Yes I read the instruction manual, but it was originally written in Italian and then translated into English. There were about 20 pages of how not to cut your hands or feet off because the mower blades are rotating. So this means I cannot go through narrow gates, it is possible but it does limit the gates that I can use.

I fired up the drum mower and started to mow in the cow pasture. I figured it was a great place to start and work out the kinks. Yes, there is a learning curve on where you can drive and how fast you can drive. After about an hour I started to hear this thunking noise. I finally stopped the mower, lifted it and waited for the blades to stop. The blades actually take about a minute to stop rotating and after hitting a rock and slicing it in two I figured out why the manufacturer had 20 pages of instructions on how not to slice off a body part.

There was a skid plate off of the bottom of one of the two drums that had come loose and was held on by a single bolt. Three bolts had already fallen out. I attempted to take a bolt out of the intact side but was unable to get one loose. So I had to take the loose one out, it came out with my fingers and then I went to Pendleton. Everything is from Italy, so it’s all going to be Metric. I had my fingers crossed and hoped I could find replacement bolts. I found 6, I needed 3 but they only had them in alloy not stainless steel like the ones that fell out. So I grabbed all the alloy they had and went home. I was putting the third one in when I realized something was different about the drum plate I was installing and the intact one. There were 14mm spaces between the bottom of the drum mower and the skid plate. There were no spacers when I found it. So, I had to go back to town and find something that could act like a spacer. I did and managed to get them installed. This is the loaner mower!

I started mowing again and just kept going until 2230 at night. I am definitely going to have to invest in some kind of aftermarket lights for the roll bar. There is 300# of antique tractor weight discs in the tractor bucket to offset the mower weight. So when I get the bucket high enough into the air to see with the headlights the tractor becomes very top heavy. I almost tipped it over twice. If I had roll bar lights I could keep the bucket closer to the ground and it would be much safer.

I came back on Wednesday and was able to finish both fields by 2100. So about 11 acres cut in 11 hours. Now I think in all reality that number could be 11 acres in 6 hours without the breakdowns and learning curve. Its supposed to rain.

Hay equipment is here!

Well, the much needed hay equipment is here. It arrived on Friday. I had Tex come out and start cleaning up fencing scraps and wood scraps. We have them strung all over the farm from doing all the fencing, since a scrap guy is coming I want to try and get all of it cleaned up, sent away or burnt. The new burn pile is already starting to grow. They tried to deliver the equipment on Wednesday but I was not available for a 4 hour window and told the clerk on the phone that they came at the end of the four hour window last time and if they would do it this time I could do Wednesday. She said no, I had to be there the entire four hours. We pushed out the delivery day to Friday as I knew Tex or myself would be available. I had to go into work that morning and was hoping to be done by 1100. They called me at 1040 to say that they were ready to deliver and in Pilot Rock! I called Tex and went home ASAP. There was three pieces of equipment delivered, the mower, the power rake and the baler.

There were some issues, the company over sold the mower I wanted so I have a loaner mower, it’s a little smaller and does not condition the grass. It’s cheaper should I decide to keep it. The round baler is smaller and only bales about 90 bales an hour vs 120 on the one we want. The one we want still has to come over on a container by ship from Italy. All of this stuff is made in Italy. We had to keep all the shipping material so that the baler and mower can be shipped back to the company when they send us our mower and baler.

I had visions of just backing up to the equipment with our quick hitch system and hooking up to everything and just putting it in the machine shed. This did not happen, as not a single piece was capable of using the quick connect. I kept trying, finally Tex told me I had to take the quick connect off the tractor and hook directly to the three point hitch.

You can see that it almost wants to do it, it just needs a couple more inches. I took pictures and sent them to the company asking for a fix. What good is a quick connect when you cannot use it? Prior to this round of equipment I had four pieces for the tractor and three of them can use the quick connect. This makes switching out a couple of minutes and that includes parking it in the correct storage spot. Now that we have four more pieces of equipment the quick connect can only work on 3/8 pieces. This is not acceptable. I ordered 8 adjustable pins that I can bolt on myself. They are about 2 inches longer so I will gain 4 inches total. Looking at the pictures I think that four inches is going to be plenty. I also ordered a box of various locking pins to hold the equipment on. The cleaned out machine shed is amazing!! There is still quit a bit of dust but I am hoping that when I get the plywood up on the hay side I can start to contain the dust. I may drag a hose out and wet down the gravel, maybe even spray down the entire inside of the machine shed to give it that once a centennial cleaning.

The old floor scale that Annmarie’s dad got from PGG has all the parts, I really want to install it and put all the pieces together. I will need a level poured concrete pad about 4×6 feet first. Next year I may do it. It shouldn’t be too bad, I can use sacrete and I have the mixer. I can just use a piece of cow panel as the rebar.

Zeke got out of the yard twice this week so Tex and I removed all the old scrap wood and fencing that was leaning up in the corner of the yard. So now there is no ramp for him to use as a launching platform over the fence. I also went and dug down the piles of dirt I had placed near the side fence.. He had a 18 inch launching platform to go over the fence. Since doing that on Friday, he has not been able to get out of the yard a single time. Who knows if it is a lack of opportunity or just an unwillingness to leave. Time will tell.

Dug out again

When I went to work Wednesday morning I knew the back creek was overflowing. Our front ditch was muddy and four times its normal size. Unfortunately, I had to go to work and could not just stop what I was doing and go up and unblock the jam. So after work I went to the hardware store and picked up a portable handsaw and a pitchfork that has the tines bent 90 degrees. I figured that would work better than a metal rake at getting stuff out of the creek.

I texted Tex to see if he was available but he had homework. Again, you gotta like a guy with priorities. I made a second change, I put on my chest waders! I even remembered to but a belt on the outside of the waders above my waist to prevent water from getting in rapidly and weighing me down. It’s a safety feature that I figured was important since I was working alone. I also got a pair of rubber impregnated gloves that would dry out fast after I was done. I loaded it all up in the pickup and drove to the upper end. No sense in trudging through the mud the entire distance.

The chest waders were a game changer! I finally just waded into the water and started to pull the piles apart with my gloved hands. I was in water up to my stomach. I made sure to stand on the upriver side of the mass so if it broke loose it would not take me downstream. I spent an hour and managed to tear the large blockage in half. Unfortunately, a tree in the stream bed is the reason for the blockage and there is no fix for that in belly high water. I did manage to lower the water level by about 6 inches in that spot which stopped the water from spilling over the sides. So I was successful and did not have to spend all day. It was a pleasant surprise.

The fields are getting water logged but seem to be recovering except for the growing mud spot. I really need to dig out the irrigation ditch as I believe it could catch the overflow, and run it along side the field then dump back into the stream lower down. Unfortunately, there is no way to get any type of powered equipment into the fields currently. On Wednesday I waited for delivery of the new Power Harrow and seeder. It came on a semi-truck. I was supposed to be available for delivery from 1100-1500. I was home by 1115. The delivery driver called me and then dropped off the pallet at 1445. It was prior to the 1500 deadline. I watched a movie and some bad anime waiting for him to show up. I had to run back to work and got back late. I fully expected to be able to back up the tractor to the pallet, using the quick hitch just hook on and go. I don’t know what I was thinking or why I thought easy was going to work. The attachments do not line up with my quick hitch. I had to remove the quick hitch, extend the tension on the rods and hook it all up. Then I could not lift it off the pallets as my adjustable bar needed to be tightened. This takes a stiff rod poked through a hole. I have misplaced my large screwdriver and every piece of metal I stuffed through the hole bent. I fought and swore and had the harrow in the machine shop 1.5 hours later. I moved the thing 30 feet. I read the very thin manual that came with it and learned nothing from it. I had the electronic copies sent to my email and still need to read them. I need to get this thing up and running in the next 2 weeks. If only the weather will cooperate.

New Power Harrow